Skip to content

Guide · UK & Ireland

Internal wall insulation (IWI) on solid masonry: breathable woodfibre vs PIR

Why retrofitting internal insulation on solid brick or stone can cause joist-end rot and hidden interstitial damp. The building physics of vapour permeability, capillary activity, and why breathable woodfibre outperforms foil-faced PIR.

  1. 1

    The solid wall temperature shift: Colder masonry and inward drying

    A pre-1919 Georgian–Victorian–Edwardian solid brick wall (commonly 9-inch or 13.5-inch, lime-built, vapour-open) has no cavity. In its uninsulated state, heat leaking from the house warms the brickwork, helping wind-driven rain evaporate outward and inward. When you install internal wall insulation, you keep heat inside the room — but the masonry behind the insulation becomes significantly colder in winter. Without heat to dry it, the wall stays wet for longer, increasing frost damage risk and moving the dew point directly behind the new lining.

  2. 2

    Why foil-faced PIR boards fail on traditional solid brick

    On pre-1919 breathable solid masonry, applying rigid foil-faced PIR insulation boards (bonded with cement dabs) creates an impermeable moisture barrier on the warm side. If wind-driven rain penetrates external mortar joints, water becomes trapped against the back of the cold foil. Moisture cannot dry inward into the room. Over time, condensation inside the wall or roof layers (interstitial condensation) accumulates behind the boards, unseen until black mould blooms or structural timber rots (BS 5250 moisture risk; Historic England retrofit guidance).

  3. 3

    Embedded timber joist pockets: The invisible rot hazard

    Where intermediate suspended timber floor joists pass through the internal insulation and seat directly into pockets in the cold solid brick wall, a catastrophic rot hazard is created. The joist end is now located in a cold, damp microclimate with no room heat to dry it. Under BS 5250 moisture-risk logic, sustained high relative humidity in such pockets (commonly discussed above about 80% RH with elevated timber moisture content) can support Serpula lacrymans (dry rot) or Coniophora puteana (wet rot). Joist ends can fail within a few heating seasons while remaining visually hidden behind plasterboard — do not treat any fixed 3–7 year band as a universal prediction.

  4. 4

    The established solution: Breathable, capillary-active woodfibre and lime

    Historic England and BS 5250 recommend vapour-permeable, capillary-active insulation systems — such as dense woodfibre boards (e.g. Steico, Pavatex) or cork boards. These must be fully wet-bedded in a continuous parge coat of Natural Hydraulic Lime (NHL 2 or NHL 3.5) with no air gaps, and finished with a breathable lime plaster and mineral silicate paint. Capillary action pulls any condensed water back into the board, allowing it to evaporate harmlessly into the room when humidity drops.

  5. 5

    Thermal bridging at window reveals, party walls, and intermediate floors

    Insulating only the main wall plane forces heat to escape rapidly at uninsulated junctions: window reveals, party wall returns, and floor perimeters. These cold bridges drop below the dew point, creating concentrated mould strips. You must return thin insulation (minimum 20mm aerogel or woodfibre) around window reveals and specify joist-end wraps with vapour-permeable airtightness membranes.

  6. 6

    Pre-installation checks: Repair rainwater shedding and lower ground levels first

    Never insulate a solid wall that is already damp. Before measuring for insulation, ensure external pointing is sound in lime mortar, gutters and downpipes are leak-free, external ground levels are at least 150mm below the internal floor, and any impermeable cement renders are removed. You must cure the external rain path before you alter the thermal balance of the wall.