Cement tanking on an above-ground wall
A waterproof cement barrier on the inside face. Proper tanking is a below-ground system designed to BS 8102. Used on an ordinary damp wall above ground, it traps moisture in the masonry and moves the damage.
Heavily marketed, known to harm traditional fabric, or supported mainly by people who sell it. Not never — not a first recommendation.
When it works
Almost nowhere in the domestic above-ground cases this site is about. Below ground, a Type A barrier can be right when the structure, the drainage, and the grade of resistance are designed together, with somewhere for water to go.
When it fails or causes harm
It is applied to a living-room wall, a chimney breast, or a lime-built solid wall because a contractor has a tanking specification. The wall stays wet, salts blow the coating off, and the floor junction rots.
Frequently asked
Why is cement tanking on a living-room chimney breast usually the wrong remedy?
Above-ground domestic walls need to dry; a waterproof cement barrier traps residual moisture and salts so coatings blow and junctions rot. Proper tanking is a below-ground system designed to BS 8102 with structure, drainage, and a place for water to go — not a living-room breast specification. Chimney breasts often carry hygroscopic flue salts (BRE Digest 245), which tanking seals in. Historic England practice rejects cement tanking on lime-built fabric for the same reason. Stop the source, replace contaminated plaster with a compatible system, and refuse tanking sold against a meter reading on a chimney breast.