Skip to content
Caution

Damp-proof paint and waterproof coatings

A coating that promises to hold damp in the wall. It can hide a stain for a season. It does not stop rain, ground moisture, or condensation, and on pre-1919 breathable solid masonry it stops the wall drying.

Heavily marketed, known to harm traditional fabric, or supported mainly by people who sell it. Not never — not a first recommendation.

When it works

A sound, dry, modern surface needs a decorative finish. That is paint, not a repair.

When it fails or causes harm

It is the whole response to mould, a tide mark, or blown plaster. Mould will grow on the film if the room is still humid. Salts will push the film off. Trapped water will damage the masonry or the timber behind it.

Frequently asked

Do damp-proof paints fix condensation or trap moisture in traditional fabric?

They do not fix condensation. Mould returns if room humidity and cold surfaces remain (BS 5250); anti-mould films only delay the stain. On traditional solid walls, waterproof coatings reduce drying and push failure into the masonry or timber behind (Historic England). Treat condensation with extract, background heat, and cold-bridge detailing; treat rain and ground moisture at the path. Use ordinary paint only on a sound, dry, modern surface — never as the sole response to a tide mark or blown plaster.

Mechanisms it is attached to