Skip to content

Guide · UK & Ireland

Lead paint in older dwellings — disturb carefully

Where lead-based paints remain in pre-1970s UK stock, how refurbishment creates exposure risk, and why this sits beside asbestos and CDM planning — not a damp diagnosis.

  1. 1

    Assume lead on older glossy paint until tested

    Lead pigments were common in older domestic paints. Soft bare timber and flaking paint in homes with young children are a health concern. Testing beats assumption before aggressive stripping.

  2. 2

    Exposure is about dust and fumes

    Dry sanding, burning-off, and needle-gunning liberate lead dust and fume. HSE lead guidance expects control measures, PPE, and cleaning — not DIY ‘quick strip’ on a nursery wall.

  3. 3

    Plan under CDM and refurbishment surveys

    Lead sits beside asbestos and structural unknowns in pre-construction information (CDM 2015). It is not covered by an asbestos survey alone — see HSG264 for asbestos; use HSE lead guidance for paint.

  4. 4

    Prefer methods that suppress dust

    Wet abrasion, chemical strippers used as directed, replacement of components, and HEPA cleaning beat open dry sanding. Dispose of waste as the rules require.

  5. 5

    Do not confuse with moisture building defects

    Flaking paint can be lead risk, vapour failure, or salts. Name the hazard: health exposure vs fabric moisture (BS 5250). Both may be present.