North America · Walls
Light timber platform frame
Storey-height timber stud walls on a platform floor, sheathed, insulated, and clad — the default US and Canadian house. Not an English cavity wall and not a tropical RC frame. Moisture control is vapour, cladding rain-screen, and attic or crawlspace ventilation.
20th century – present (ordinary North American house)
How to recognise it
- Dimensional lumber (or engineered studs) at regular centres, plywood or OSB sheathing, exterior cladding (vinyl, fibre-cement, brick veneer, stucco)
- Attic with trusses or rafters; basement or crawlspace common; brick veneer is a cladding, not a structural English cavity leaf
- Interior gypsum board; electrical and services run in the stud voids
How it is built
- Sole plate on foundation or floor platform; studs; top plate; next floor platform built on that — hence 'platform' frame. Older balloon frame ran studs full height
- Cavity insulation between studs, vapour control layer toward the winter-warm side (climate-dependent detailing), weather-resistive barrier and cladding outside
- Foundations: concrete basement, crawlspace, or slab-on-grade depending on frost line and region
How it behaves
Wind-driven rain fails at cladding, flashing, and window pans — not through a masonry leaf. Ice dams and attic condensation matter in cold climates. Crawlspaces without ground cover and ventilation (or a sealed conditioned crawl) wet the joists. Brick veneer without a drained cavity or with blocked weeps stains like penetrating damp but is a cladding leak. Importing UK cavity-tie or rising-damp logic misreads how the wall is built.
What to watch
- Missing or blocked brick-veneer weeps and flashings
- Crawlspace moisture and mould on joists
- Attic bypasses, bath fans dumping into the loft, ice dams at eaves
- Vinyl wallpaper or impermeable finishes on cool exterior walls in humid summers (inward drying blocked)
Mechanisms that belong here
- Penetrating damp
Rain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.
- A leak from a pipe, a roof, or a fitting
Liquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.
- Surface condensation
Room air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.
- Condensation inside the wall or roof layers (interstitial condensation)
Water condensing inside the construction, not on the paint. Typical of cold roofs, timber frames with a broken vapour-control layer (on the warm side of the wall), and solid walls insulated on the inside without a moisture assessment.
- Moisture and decay under a timber ground floor
A suspended timber floor with a wet, still void after designed air-brick airflow was blocked. Joists, wall plates, and ends built into the wall decay; ground-floor damp is often mis-sold as rising damp.
- Settlement
The building or its fill compressing soon after it was built, then usually stopping. Old, stable settlement is a record, not a live defect.