Insulated concrete form (ICF) walls
Stay-in-place foam forms filled with reinforced concrete — a continuous insulated concrete wall used for houses and small multifamily. Moisture and thermal behaviour differ from both platform frame and bare CMU.
Late 20th century – present (growing North American low-rise)
How to recognise it
- Thick walls with foam visible at openings before finishes; solid feel when knocked
- Exterior cladding over foam (stucco systems, siding, masonry veneer) with specific fastening patterns
- Often marketed for energy and storm performance; interiors commonly finished on the inner foam face
How it is built
- Stacked interlocking EPS/XPS forms, steel reinforcement, concrete poured and vibrated; lintels and openings formed in the system
- Below-grade waterproofing and drainage critical where ICF meets basements
- Cladding and WRB details must follow the ICF manufacturer — fasteners and rainscreens are not generic platform-frame practice
How it behaves
The concrete core is robust; failures concentrate at openings, roof ties, below-grade waterproofing, and cladding attachments that crush or bridge the foam. Interstitial wetting of foam cavities from leaked openings can be slow to show. Treat as its own way of building — neither ‘just concrete’ nor ‘just foam insulation on studs’.
What to watch
- Window and door pan flashings incompatible with the form system
- Below-grade leaks at footing/ICF junctions
- Cladding fasteners undersized or corroding in coastal exposure
- Assuming platform-frame vapour rules without reading the manufacturer’s climate notes
Mechanisms that belong here
- Penetrating damp
Rain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.
- A leak from a pipe, a roof, or a fitting
Liquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.
- Surface condensation
Room air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.
- Condensation inside the wall or roof layers (interstitial condensation)
Water condensing inside the construction, not on the paint. Typical of cold roofs, timber frames with a broken vapour-control layer (on the warm side of the wall), and solid walls insulated on the inside without a moisture assessment.
- Settlement
The building or its fill compressing soon after it was built, then usually stopping. Old, stable settlement is a record, not a live defect.