Skip to content

Surveyor tools

Fire door gap & closer compliance

A quick BS 8214 triage for perimeter clearances, threshold undercut with a drop seal, and whether the closer can latch the leaf from about 10° open. Use it on site with a gap gauge — then finish the full door-set checklist. The notes under the checker are the judgements a gap reading cannot make on its own.

Enter calibrated gap-gauge readings (mm). BS 8214 wants 2–4 mm at head and jambs. Threshold with a working drop-down seal should be ≤ 3 mm. Then test the closer from about 50–75 mm open.

Closer latches from ≈10° / 50–75 mm open?

Result

Incomplete — finish the measurements

Some items are still unmeasured. Complete the gap gauge and closer tests before calling the door compliant.

  • Head gappass · 3 mm

    Within the BS 8214 2 mm–4 mm perimeter band (3 mm nominal).

  • Hinge side gappass · 3 mm

    Within the BS 8214 2 mm–4 mm perimeter band (3 mm nominal).

  • Latch side gappass · 3 mm

    Within the BS 8214 2 mm–4 mm perimeter band (3 mm nominal).

  • Threshold clearance (drop seal fitted)pass · 2.5 mm

    ≤ 3 mm with an operational drop-down seal matches BS 8214 field practice / manufacturer tested undercut used with FD30S/FD60S sets. Repeat the reading at both ends; an uneven floor is recorded as its own defect.

  • Closer latching from part-openmissing · not tested

    Open the leaf about 50–75 mm (≈10°) and release. The latch bolt must engage fully without assistance.

  • Closer power sizepass · size 3

    Power size 3 meets the usual minimum (size 3) for fire doors.

Triage aid aligned with BS 8214 and the field checklist on the fire-door guide. It does not replace a BM TRADA / Certifire inspection, certification plug check, hinge grade check, a visual check of the leaf, or sighting the frame for twist. Any change to the door needs the manufacturer's guidance. An unlatched door fails regardless of gap numbers.

Frequently asked

Does this fire door’s head and jamb gap fall inside the BS 8214 2–4 mm band?

Measure head, hanging jamb, and closing jamb with a calibrated gap gauge. BS 8214 requires 2–4 mm (3 mm nominal). Under 2 mm risks binding; over 4 mm exceeds typical intumescent capacity. Record three readings minimum; a front-view ‘looks like 3 mm’ on a twisted frame can still fail smoke-seal contact in the rebate. Threshold undercut is a separate check against the drop-seal/floor detail.

Will the door closer latch from a 50–75 mm opening, and is closer power size ≥ 3?

Open the leaf about 10° (leading-edge gap roughly 50–75 mm), release, and confirm the closer (BS EN 1154) drives the latch fully home against seals without assistance. Fire doors normally need minimum power size 3. A door that only latches from wide open fails life-safety even if BS 8214 gaps look compliant. Log closer size, latch engagement, and any hold-open abuse.

Field notes

The checker scores the measurements you enter. These points still have to be looked at on the door, and they often depend on the manufacturer's guidance being to hand.

Ask the manufacturer before changing the door

Any alteration — lipping, planing, filling, or extra ironmongery — should follow that door manufacturer's guidance. It is reasonable to instruct someone to lip the bottom edge. The lip still has to be the timber, thickness, adhesive, and fixing pattern they specify, or they may no longer treat the door as compliant.

A bottom gap over 12 mm has two possible outcomes

On some doorsets a threshold gap over 12 mm is a fail and the leaf is replaced. On others, where the manufacturer permits it, lipping brings the gap under 12 mm and an integrated drop-down seal then closes what remains when the door latches. The gauge records the gap. The data sheet decides which repair is allowed.

Uneven floors are a defect to resolve

Floors that rise and fall along the threshold are a routine finding. Measure at both ends and the centre. A centre reading inside the limit can hide a smoke path at one end, or a high spot that stops the drop seal seating. Record the floor as an issue to be resolved — make it good, or use a threshold detail the manufacturer accepts — before the undercut is signed off.

Look at the leaf, including old screw holes

A visual check belongs with the gap readings. Screw holes, old ironmongery, and any break in the face need recording and repairing in the manner the manufacturer sets out. A hole can be a fail where it lets fire reach the core sooner, so the door loses integrity faster than its test. It can also be repairable, where they publish a plug, patch, or facing method. The result depends on having that guidance. Without it, the leaf cannot honestly be called either passed or made good.

Need a full single-door client pack (photos, evidence grade, hardware, branded PDF)? Use the premium fire door inspection. Related reading: fire door surveying guide, inspection protocol, factory and site assembly.