Skip to content

Moisture tools

Is the underfloor void breathing?

First contact for ground-floor damp that looks like rising damp: should there be airflow under this floor? How was it built in — air bricks on opposite sides — and has a new drive, patio, conservatory, or extension sealed it? Only if the void can breathe turn to drains, bridging, and true rising damp.

  1. 1.Suspended timber (not a slab)Critical

    Is the damp ground-floor zone a suspended timber floor over a void (hollow boards, joists) rather than a ground-bearing concrete slab?

    Air-brick remedies only apply where a void exists. A solid slab needs membrane/edge/DPC logic, not underfloor cross-ventilation — Approved Document C.

  2. 2.Air bricks on opposite sidesCritical

    Are air bricks (or equivalent void vents) present on opposite elevations so air can cross under the floor?

    Construction of this era usually provided front-and-back (or opposing) air bricks with the DPC so the void could dry. One side alone is inefficient — same entry-and-exit rule as loft eaves.

  3. 3.Air bricks clear of ground / finishesCritical

    Are the air bricks clear — not buried by a new drive, patio, planter, render, or insulation — and still open to free air?

    Landscaping, conservatory abutments, and front-drive works commonly seal the designed airflow. The void then stays moist for years and ground-floor damp is mis-sold as rising damp. Chemical DPC products fail until ventilation is restored.

  4. 4.Clear path through the voidCritical

    Can air actually travel through the underfloor void (sleeper-wall openings clear, no insulation or debris blocking the cross-path)?

    External vents that look open still fail if sleeper walls or stuffed insulation stop the breeze. Moving air keeps joists and wall plates below fungal moisture contents — BS 5250 / AD C.

  5. 5.Extensions have not sealed the void

    Have later solid extensions, conservatories, or partial slabs left the remaining suspended floor’s vents and cross-path intact?

    A new solid floor poured across old vents, or a conservatory cladding the rear elevation, commonly kills underfloor airflow for rooms that remain timber. The damp then appears years after the ‘improvement’.

  6. 6.No active drain / pipe leak into the void

    With ventilation restored or confirmed, is there still no evidence of a leaking drain, soil pipe, or supply pipe wetting the void?

    Airflow is first. If the void breathes and timber stays wet, expand to water escape — drains and pipes. Ventilation alone will not dry a live leak.

  7. 7.DPC / ground clearance OK

    Is external ground / hardstanding kept about 150 mm below the damp-proof course, without render or plaster bridging the course?

    High ground and bridging are the usual Digest 245 ‘rising damp’ mimics alongside blocked subfloor vents. Both must be checked; restoring air bricks does not uncover a buried DPC.

Result

No answers yet

First contact for ground-floor damp: should there be underfloor airflow here? How was it built in (air bricks on opposite sides)? Has landscaping, a drive, conservatory, or extension impeded it? Only if the void breathes expand to drains, mortar paths, and true rising damp.

Confirmed yes: 0 · No: 0 · Not sure: 7

What this reading suggests

Ask each subfloor question (suspended timber, opposite air bricks, vents clear, void path, extensions, drain leaks, DPC clearance) then re-run triage.

  • Suspended timber (not a slab)unknown · unknown

    Not confirmed yet. Ask: Is the damp ground-floor zone a suspended timber floor over a void (hollow boards, joists) rather than a ground-bearing concrete slab?

    Related guidance →
  • Air bricks on opposite sidesunknown · unknown

    Not confirmed yet. Ask: Are air bricks (or equivalent void vents) present on opposite elevations so air can cross under the floor?

    Related guidance →
  • Air bricks clear of ground / finishesunknown · unknown

    Not confirmed yet. Ask: Are the air bricks clear — not buried by a new drive, patio, planter, render, or insulation — and still open to free air?

    Related guidance →
  • Clear path through the voidunknown · unknown

    Not confirmed yet. Ask: Can air actually travel through the underfloor void (sleeper-wall openings clear, no insulation or debris blocking the cross-path)?

    Related guidance →
  • Extensions have not sealed the voidunknown · unknown

    Not confirmed yet. Ask: Have later solid extensions, conservatories, or partial slabs left the remaining suspended floor’s vents and cross-path intact?

    Related guidance →
  • No active drain / pipe leak into the voidunknown · unknown

    Not confirmed yet. Ask: With ventilation restored or confirmed, is there still no evidence of a leaking drain, soil pipe, or supply pipe wetting the void?

    Related guidance →
  • DPC / ground clearance OKunknown · unknown

    Not confirmed yet. Ask: Is external ground / hardstanding kept about 150 mm below the damp-proof course, without render or plaster bridging the course?

    Related guidance →

Field triage against Approved Document C ventilated voids and BS 5250 timber moisture risk — not a substitute for opening up, drain CCTV, or a Chartered Building Surveyor’s investigation.

Frequently asked

At first contact for ground-floor damp, what should be checked before rising-damp injection?

Whether the floor is suspended timber, whether opposite air bricks were designed in, and whether a drive, patio, planter, conservatory, or extension has buried or sealed them (Approved Document C ventilated void; BS 5250). Fail air-bricks-clear or void-path-open on the triage and restore cross-ventilation (/remedies/subfloor-ventilation) before chemical DPC quotes. BRE Digest 245 rejects meter-only rising-damp sales. Only once airflow works expand to drains, bridging, and sampling.

Why do new front drives and rear extensions so often create damp that looks like rising damp?

They commonly cover or seal the opposite air bricks that dried the underfloor void (Approved Document C expects that cross-ventilation; BS 5250 frames the timber moisture risk). Moisture then builds for years under joists and boards and presents at skirtings — sold as rising damp while the efficient fix is reopen through-flow. Photograph vents on every elevation against finished hardstanding; reinstate clear opposite vents or continuity past the extension. Do not inject while the void remains still and wet (BRE Digest 245 rejects meter-only rising-damp sales).

When should the investigation leave airflow and look at drains or true rising damp?

When suspended-timber airflow is proved adequate (opposite clear vents, open void path) and damp or decay continues. Then expand to water escape into the void, high ground / bridged DPC (Digest 245 / AD C ~150 mm), and free-moisture plus salt sampling for capillary rise (moisture climbing from the ground through the masonry). Airflow first on every damp call — loft eaves upstairs, underfloor air bricks downstairs — then mechanism-specific proof.

Related reading: subfloor airflow guide, restore underfloor ventilation, suspended timber floors, subfloor moisture, loft ventilation triage.