Is this a BIM-governed project?
BIM is an information-management process, not modelling software alone. Answer yes / no / not sure to OIR, AIR, EIR, the responsibility matrix, CDE, meetings with minutes, and COBie compiled through the job. Use the answers to confirm what is in place — or list what is still missing.
1.OIR — Organisational Information RequirementsCritical
Does the appointing party (client / asset owner) have Organisational Information Requirements (OIR)?
OIR state what the organisation needs from assets over time. Without them, project data has no strategic purpose.
2.PIR — Project Information RequirementsCritical
Are Project Information Requirements (PIR) defined for this project’s decision gates?
PIR name what information is needed at each project milestone so decisions are evidence-based.
3.AIR — Asset Information RequirementsCritical
Are Asset Information Requirements (AIR) defined for operation and maintenance after handover?
Most cost sits in the operational life. AIR tell the supply chain what FM needs for decades, not only what looks good in a render.
4.EIR — Exchange Information RequirementsCritical
Are Exchange Information Requirements (EIR) written into the appointment / tender?
EIR turn OIR/PIR/AIR into contractual deliverables: what, when, in which format, to what Level of Information Need.
5.Responsibility matrixCritical
Is there a responsibility matrix naming who supplies which information, at which stage?
BIM is a process of duties. Without named owners, COBie rows and models arrive empty or late.
6.Appointing / appointed party rolesCritical
Are Appointing Party, Lead Appointed Party, and Appointed Parties clearly identified?
ISO 19650 replaces vague ‘client vs contractor’ silos with named information roles.
7.BIM Execution Plan (BEP)Critical
Is there a BIM Execution Plan (pre- and/or post-appointment BEP) for this delivery team?
The BEP shows how the team will meet the EIR: tools, federation, security, and delivery methods.
8.Master Information Delivery Plan (MIDP)
Is there a Master Information Delivery Plan (MIDP) or equivalent delivery schedule for information containers?
The MIDP turns responsibilities into a timed plan of what will be exchanged.
9.Common Data Environment (CDE)Critical
Is a Common Data Environment (CDE) in use with WIP / Shared / Published / Archived states?
Without a single governed source of truth, ‘BIM’ collapses into email attachments and conflicting model copies.
10.Information / coordination meetings & minutes
Is there a schedule of information or model-coordination meetings, with minutes retained?
Clash and information issues are resolved in governed exchanges. Undocumented meetings leave no audit of who agreed what.
11.COBie / structured asset data (through the project)Critical
Is structured asset data (commonly COBie) being compiled through the project — not only promised as a last-week spreadsheet?
COBie and equivalent open asset schemas make handover usable for FM. Populating them throughout delivery avoids empty cells at practical completion.
Result
No answers yet
Work through the checklist. Record yes / no / not sure for each item before claiming the project is BIM-compliant.
Confirmed yes: 0 · No: 0 · Not sure: 11
What this reading suggests
Finish the BIM checklist first — OIR, PIR, AIR, EIR, responsibility matrix, roles, BEP, CDE, meetings/minutes, and COBie — then re-run the verification.
- OIR — Organisational Information Requirementsunknown · unknown
Not confirmed yet. Ask: Does the appointing party (client / asset owner) have Organisational Information Requirements (OIR)?
Related guidance → - PIR — Project Information Requirementsunknown · unknown
Not confirmed yet. Ask: Are Project Information Requirements (PIR) defined for this project’s decision gates?
Related guidance → - AIR — Asset Information Requirementsunknown · unknown
Not confirmed yet. Ask: Are Asset Information Requirements (AIR) defined for operation and maintenance after handover?
Related guidance → - EIR — Exchange Information Requirementsunknown · unknown
Not confirmed yet. Ask: Are Exchange Information Requirements (EIR) written into the appointment / tender?
Related guidance → - Responsibility matrixunknown · unknown
Not confirmed yet. Ask: Is there a responsibility matrix naming who supplies which information, at which stage?
Related guidance → - Appointing / appointed party rolesunknown · unknown
Not confirmed yet. Ask: Are Appointing Party, Lead Appointed Party, and Appointed Parties clearly identified?
Related guidance → - BIM Execution Plan (BEP)unknown · unknown
Not confirmed yet. Ask: Is there a BIM Execution Plan (pre- and/or post-appointment BEP) for this delivery team?
Related guidance → - Master Information Delivery Plan (MIDP)unknown · unknown
Not confirmed yet. Ask: Is there a Master Information Delivery Plan (MIDP) or equivalent delivery schedule for information containers?
Related guidance → - Common Data Environment (CDE)unknown · unknown
Not confirmed yet. Ask: Is a Common Data Environment (CDE) in use with WIP / Shared / Published / Archived states?
Related guidance → - Information / coordination meetings & minutesunknown · unknown
Not confirmed yet. Ask: Is there a schedule of information or model-coordination meetings, with minutes retained?
Related guidance → - COBie / structured asset data (through the project)unknown · unknown
Not confirmed yet. Ask: Is structured asset data (commonly COBie) being compiled through the project — not only promised as a last-week spreadsheet?
Related guidance →
Triage against ISO 19650 information management — not a substitute for a formal UK BIM Framework audit, employer certification, or sampling the actual CDE and COBie files.
Frequently asked
Does this project have OIR, AIR, EIR, a responsibility matrix, and a CDE?
Under ISO 19650 these are the governance minimum before claiming BIM: Organizational and Asset Information Requirements feeding an Exchange Information Requirements set, a named responsibility matrix, and a Common Data Environment with controlled states. Tick yes only when artefacts exist and are used — not when someone plans to write them later. Absence of any critical item means the job is modelling-led, not BIM-governed (UK BIM Framework).
Is COBie being populated through the project, and are coordination meetings minuted?
COBie (BS 1192-4 / EIR asset rows) must be populated through delivery against the MIDP, not dumped empty at PC. Coordination meetings need minutes that close information actions into the CDE. Sample COBie against installed assets; if meetings leave no minutes or COBie cells stay blank until snagging, record ‘no’ on the verification checklist and refuse BIM-compliance language.
Step-by-step: if critical BIM checklist items are ‘no’, what must be added before calling the job BIM-compliant?
Stop claiming compliance. (1) Appointing Party issues/updates OIR–AIR–EIR. (2) Name Lead Appointed Party and publish a responsibility matrix. (3) Agree pre- then post-appointment BEP with MIDP/TIDPs. (4) Stand up a CDE with WIP/Shared/Published/Archived controls (ISO 19650). (5) Minute coordination and start COBie population against gates. (6) Re-run the verification checklist — critical items must be yes before BIM language is used. Geometry alone never clears a failed critical row.
Related reading: BIM as a process, ISO 19650, COBie handover, ISO 19650 workflow guide.