Skip to content

Block management · BIM tools

Which retrospective BIM tier does this estate need?

Not every block needs a digital twin. Answer the estate questions below to see whether to stop at verified plans, add passive-fire mapping, commission full AIM/COBie, or only then consider sensors. Use the result in the resident consultation pack — then get provider prices for each package separately.

  1. 1.Verified floor plans already exist

    Does the estate already hold surveyed, dimensionally trustworthy digital floor plans (not marketing layouts) in a controlled store?

    Tier 1 is reality capture to verified 2D plans in a CDE. Skip only when that foundation already exists.

  2. 2.Higher-risk / Golden Thread duties

    Is the building a higher-risk building (or otherwise under Building Safety Act Accountable Person / Golden Thread information duties)?

    HRB duties often force accurate plans plus life-safety records — typically Tier 1+2 even when full AIM waits.

  3. 3.Fire / PFP evidence gap

    Are fire-door, firestopping, or compartmentation records incomplete, disputed, or missing for FRA / Golden Thread packs?

    Tier 2 is focused passive-fire mapping. It can be priced separately from a full MEP asset census.

  4. 4.Cascade reactive maintenance

    Do roofs, stacks, windows, or plant keep failing with no trustworthy manufacturer / warranty / spare schedules?

    Tier 3 AIM/COBie cuts investigation waste when every ticket starts a forensic hunt.

  5. 5.Major works need measured quantities

    Is a Landlord and Tenant Act 1985 Section 20 (or similar) major-works programme coming that needs measured roof/façade/asset quantities?

    Accurate mesh and asset rows support reasonable service-charge consultation; rough tape surveys invite challenge.

  6. 6.Asset Information Model already trustworthy

    Is a populated AIM / COBie-style register already verified against sample installed assets (not an empty model)?

    Tier 4 twins and sensors only help after Tier 3 data is trustworthy — otherwise alerts lie.

  7. 7.Live twin CapEx / opex case

    Is there a written CapEx and running-cost case for sensors, cloud twin hosting, and specialist integration that residents can see?

    Many blocks never justify Tier 4. Agents should say so when the brochure outruns the budget.

Suggested stopping tier

Tier 1 · Tier 1 — verified floor plans

Start with verified digital floor plans

Price Tier 1 (reality capture → DWG/PDF plans in a CDE) first. Agree with residents that fire mapping, full AIM, and any twin are separate options — not automatic extras.

Yes: 0 · No: 0 · Not sure: 7

Price as separate packages

  • •Tier 1: point cloud + verified floor plans in an ISO 19650-style CDE

What this reading suggests

Recommended stopping tier: 1 (Tier 1 — verified floor plans). Price Tier 1 (reality capture → DWG/PDF plans in a CDE) first. Agree with residents that fire mapping, full AIM, and any twin are separate options — not automatic extras. Ask the provider to price Tier 1, Tier 1+2, Tier 1+2+3, and optional Tier 4 separately with exclusions. Use the block-management process tiers and ISO 19650-3 as the reference — marketing ROI alone is not evidence.

Triage for resident consultation packs — not a fee quote, not an appointment of any named BIM supplier, and not a substitute for Landlord and Tenant Act 1985 reasonableness advice from the estate's own professionals.

Frequently asked

How should a managing agent choose a retrospective BIM stopping tier with residents?

Table four packages before any scan: Tier 1 verified plans in a CDE; Tier 2 passive-fire mapping for Golden Thread/FRA gaps; Tier 3 AIM/COBie asset intelligence; Tier 4 optional twin/sensors only on verified AIM (ISO 19650-3; Building Safety Act 2022; CDBB Gemini sequencing). Demand separate prices and exclusions; Landlord and Tenant Act 1985 reasonableness and Section 20 consultation apply where thresholds are met — do not accept mid-programme fire or IoT ‘extras’ on a Tier 1 appointment.

When does Tier 4 (digital twin) become appropriate on a leasehold block?

Only after a populated AIM/COBie-style register has passed sample verification against installed assets and residents see a written CapEx/opex case for sensors, cloud hosting, and specialist integration. Twin CapEx without trustworthy Tier 3 data automates wrong alerts — recommend Tier 3 first; cite ISO 19650-3 and CDBB Gemini, not brochure ROI.

Related reading: tier selection guide, process tiers topic, retrospective scan-to-BIM, BIM verification checklist.