Skip to content

Guide · UK & Ireland

Choosing a retrospective BIM tier with residents before scanning

A managing-agent walkthrough: table Tier 1 plans, Tier 2 fire mapping, Tier 3 AIM/COBie, and optional Tier 4 twin with leaseholders — agree the stopping tier and priced exclusions before any laser scan, under Landlord and Tenant Act 1985 reasonableness and Building Safety Act information duties.

  1. 1

    Name the problem the estate actually has

    Write one page for the RMC or residents’ association: missing plans; incomplete fire-door / compartmentation evidence for FRA or Golden Thread; cascade tickets with no product schedules; an upcoming Section 20 programme that needs measured quantities; or a desire for live energy/alerts. Do not start from a vendor’s ‘digital twin’ slide. The problem statement decides which tiers are even relevant.

  2. 2

    Explain the four tiers in plain language

    Tier 1 — surveyed digital floor plans in a Common Data Environment. Tier 2 — passive-fire element survey and data for life-safety / Golden Thread packs. Tier 3 — fuller as-built model plus AIM/COBie-style asset tagging (including documented alternatives where makers are gone). Tier 4 — sensors and interactive twin only on a verified Tier 3 base. Point residents at the Buildopedia process topic and the interactive tier selector tool so the vocabulary is shared.

  3. 3

    Map duties and waste to tiers — not ambition

    Higher-risk buildings and Accountable Person / Golden Thread gaps usually need Tier 1+2 even if full AIM waits. Cascade estates that keep replacing roofs, stacks, and ironmongery without schedules usually gain most from Tier 3. Tier 4 is optional future-proofing after sample AIM checks pass. Not every development needs a twin; cost-effectiveness and resident outcomes set the brief (Building Safety Act 2022; ISO 19650-3; Landlord and Tenant Act 1985).

  4. 4

    Demand separately priced packages and exclusions

    Ask providers to price Tier 1, Tier 1+2, Tier 1+2+3, and optional Tier 4 as distinct lines. Fire-PFP survey, COBie population, Unity/cloud viewers, electrician-led sensor installs, and ongoing cloud hosting must not appear as mid-programme ‘extras’ if the appointment was Tier 1. Write the stopping tier and open formats (point cloud, DWG/IFC, COBie-like tables) into the AIR/EIR before mobilisation.

  5. 5

    Put the CDE in place from the first upload

    Even floor plans belong in an ISO 19650-style CDE with role-based access — agent/AP, specialists, limited resident published view — not email. Later tiers enrich the same container. Starting without a CDE means Tier 2–4 files will scatter again and the Golden Thread habit fails at the foundation stage.

  6. 6

    Consult, then change-control anything above the agreed tier

    Take the tier ladder and fee bands into the resident consultation pack. Where Section 20 thresholds are met, treat the information programme like other major works: clear scope, estimates, and observations. If the estate later wants fire tagging or a twin after appointing Tier 1 only, that is a change control with a fresh price — not an implied free upgrade.

  7. 7

    Reject twin slogans until AIM is verified

    CDBB Gemini sequencing is capture → trustworthy as-built / AIM → then live data. Photoreal materials, proprietary viewers, and AI helpers do not replace competent survey or ISO 19650 acceptance checks. Marketing ROI percentages are not Buildopedia evidence grades. Re-run the tier selector when FRA findings, cascade patterns, or CapEx cases change.