The Building Safety Act 2022 established the Building Safety Regulator within the Health and Safety Executive. In occupation, a higher-risk building is at least 18 metres or at least 7 storeys and contains at least two residential units. Hospitals and care homes of that height are higher-risk buildings during design and construction. The golden thread is the digital record the regime is built on, kept as a common data environment. ISO 19650 is the information-management method for running one. The Act requires the controls — electronic, accurate, access-controlled, and versioned — and the schedule of what that record has to hold is set out below. Compliance of an existing building is demonstrated by that record and by a plan that names every fail, with immediate risks dealt with now and the rest programmed.

Building Safety Regulator · England

What a building in this regime has to hold

An occupied higher-risk building keeps a golden thread: a digital record of the building as it actually is, with each person limited to the information their role is entitled to see, and a practicable plan for every risk that record shows. The fire-law documents sit in the same place.

A file of failures can be the start

The record has to be true. A first fire-door survey of an existing block often finds that most doors fail. On the buildings behind this reference that first-year figure sits around 90 to 95 percent. Those results belong in the common data environment. Each fail then needs a legitimate plan that will close it. Opening the file, and writing that plan, is the start. The cost of putting every door right is a later line in the plan, sequenced by risk, and it does not all fall due on the day the folder is created.

The store is a common data environment run on ISO 19650 information-management principles: information requirements agreed in advance, one source of truth, revision and status, and permissions so a resident, a surveyor and the regulator do not all see the same screen. The Building Safety Act 2022 requires those controls. It does not require a certificate with the name of the standard printed on it. For building work, regulation 31 of the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 requires an electronic facility that is accurate, up to date, readable by the person it is written for, transferable without the data being corrupted, secure against unauthorised access, and changed only by a procedure that records who made the change and when. The occupation golden thread is kept to the same standard.

The list below is the occupation regime for residential higher-risk buildings, plus the fire-law records that have to live with it. It is general information for England. It is not a safety case, a fire risk assessment, or a determination for a particular block.

Which buildings this covers

Occupied higher-risk buildings

At least 18 metres, or at least seven storeys, with at least two residential units. Height is measured from the finished ground level on the lowest side to the finished floor surface of the top storey. Storeys below ground are left out of the count to seven. The building is registered with the Building Safety Regulator before anyone lives there. The accountable person, and the principal accountable person, keep the golden thread, assess and manage the risk of fire spread and of structural failure, prepare a safety case, engage residents, operate a complaints procedure, and apply for a building assessment certificate when the regulator directs them to.

Hospitals, care homes, and new work

A hospital or care home of that height is a higher-risk building while it is designed and built, so the gateway regime and the construction golden thread apply. The occupation duties on this page are the residential regime. Gateway 2 is building-control approval from the regulator before work starts. Gateway 3 is the completion certificate: the building is occupied only after that certificate is issued, and the golden thread is handed to the people who will run it. The building assessment certificate is a later document. The regulator calls for it against the safety case of the occupied building. It is not issued at Gateway 3.

Fire law beside the regulator

The Regulatory Reform (Fire Safety) Order 2005 and the Fire Safety (England) Regulations 2022 cover a wider set of blocks. Residents in a building with a common escape route are told how fire doors must be treated. Above 11 metres, flat entrance doors are checked at least every 12 months, using best endeavours where access is refused, and communal fire doors at least every 3 months. At the high-rise threshold the fire and rescue service receives the plans and the external-wall record, and the building has a secure information box, wayfinding, and monthly checks of firefighting lifts and essential firefighting equipment. From 6 April 2026, specified buildings also follow the residential evacuation-plan regulations. In a higher-risk building these records are part of the golden thread. In a shorter building the fire-law duties still stand on their own.

A common data environment, with access by role

A resident login is a sound way to run the split. The legal duty is that residents actually receive what they must be given, in a form they can use, including people who will never open an account. Notices in the building, and a paper copy when that is what reaches them, still count. Where a login exists, that person sees their own information. The rest of the safety file stays with the people who manage the building.

Residents and owners of flats

The evacuation procedure and when they are expected to leave. Where the escape routes, fire doors, alarms, emergency lighting and call points are, and how to use equipment provided for them. That fire doors stay shut when not in use, that self-closers are left alone, and that damage is reported. A summary of the latest fire risk assessment, including the level of risk, and a summary of the safety case, including the steps taken or planned. What they must do in their own home. How to report a building safety concern and how to complain. The resident engagement strategy, who the accountable person, the responsible person and the regulator are, and which further documents they are entitled to ask for.

Accountable persons, assessors and surveyors

The full fire risk assessments, door and compartmentation surveys, damper and alarm test sheets, as-built drawings, certificates, the maintenance log, and the evidence the safety case relies on. A contractor repairing a named door sees that door's record and the manufacturer's repair method. Every change records the person and the date.

The regulator and the fire and rescue service

The Building Safety Regulator receives the safety case, the documents it depends on, and the building assessment certificate application when it asks. The fire and rescue service receives the floor plans, the single-page building plan and the external-wall record, and it can open the secure information box. Information about a resident who would have difficulty evacuating is shared with the fire service only with that resident's explicit consent.

What the golden thread has to contain

Schedule 1 to the Higher-Risk Buildings (Keeping and Provision of Information etc.) (England) Regulations 2024 is the occupation list. The cards are that list, read together with the fire-law documents that have to sit beside it. A gap analysis is this list held up against the building.

Legal record of the built building

As-built drawings of the current building

The accountable person keeps plans of the current construction, and plans of the building when it was first constructed. A construction issue shows the building that was intended at tender. Most buildings were not built exactly that way: risers move, walls are revised, doors are swapped, and later fit-out cuts holes the drawing never recorded. The legal record is a digital copy of the layout as it stands, revised when the building changes, together with the original constructed layout where it can be obtained. For a high-rise residential building the fire and rescue service is also given floor plans and a single-page building plan, with a copy in the secure information box. Compartment lines, stairs, fire doors, shafts, dampers and plant need to be readable on those drawings. A tidy PDF of the tender set, filed as if it were the building, leaves this duty open.

Fire risk assessment

An up-to-date fire risk assessment for each part of the building, made under the Fire Safety Order and kept in the golden thread. Residents receive a summary that states the level of risk. Findings from door surveys, alarm changes, alterations and repairs feed the assessment, so it stays current. Where the external wall needs it, a fire risk appraisal of the wall sits with the assessment. The assessment is the judgement of risk. It is not a product test, and a filed report that ignores a known failed door is not up to date.

Fire door surveys

Above 11 metres, flat entrance doors are checked at least every 12 months and communal fire doors at least every 3 months, and the self-closer is part of the check. Where a flat cannot be entered, the steps taken to gain access are recorded. A competent survey to BS 8214 — gaps, seals, closer, ironmongery, certification, frame and glazing — is what makes that check worth keeping. The latest report stays in the golden thread, pass or fail. Repairs follow the door manufacturer's published method: lipping, filling and new ironmongery are allowed only inside that approval. Residents are told, on moving in and then at least every 12 months, to keep fire doors shut, leave closers alone, and report damage.

Passive fire protection

Compartment walls and floors, cavity barriers, and firestopping at service penetrations, surveyed and recorded with the installation evidence: the tested detail, the product, and a competent installer. There is no routine laboratory test of an existing wall. An unsealed hole is a building safety risk on the day it is found. The most recent inspection report is golden thread information, and any open breach goes onto the same plan as a failed door.

Active fire protection

Detection and alarm, emergency lighting, suppression where it is fitted, smoke control and automatic opening vents, fire and smoke dampers, dry and wet risers, and the lifts firefighters or evacuation rely on. The golden thread holds a list of the measures and where each one is. The list is the register. It becomes evidence when the survey or the test for that measure is filed with it. A sprinkler or water-mist system limits heat. It does not stand in for a missing smoke seal or a door that will not latch: cold smoke remains the main cause of fire deaths.

Evacuation, including residents who need help leaving

The evacuation strategy for the accountable person's part of the building, and for the whole building where they are also the principal accountable person: when a person should leave, the procedure, and which measures help them. From 6 April 2026 the Fire Safety (Residential Evacuation Plans) (England) Regulations 2025 require a building emergency evacuation plan in specified buildings, and a person-centred fire risk assessment for a resident whose cognitive or physical condition would make unaided evacuation difficult, where that resident asks for one. Any emergency evacuation statement is agreed with the resident. The regulations apply at 18 metres or seven storeys, and also above 11 metres where the strategy is simultaneous evacuation.

External walls

For a high-rise residential building, a record of the design and materials of the external walls, given to the fire and rescue service and revised when the wall changes. Where the construction needs it, a fire risk appraisal of the external wall — commonly to PAS 9980 — sits with the fire risk assessment.

Structural safety

A list of the measures in place to prevent or reduce structural failure, and either an assessment of structural risk or a reasoned statement that an assessment is not necessary. The latest statement is the one kept, provided it still contains what the accountable person needs in order to manage the risk.

Safety case report

Prepared and kept current by the principal accountable person. It assesses the risk of fire spread and of structural failure, sets out the steps taken or planned, and evaluates how effectively those risks are being managed or are planned to be managed. The regulator assesses it, usually when directing an application for a building assessment certificate. Residents receive a summary in everyday language. The report stands up only while the golden thread under it is accurate.

Resident engagement and complaints

A resident engagement strategy the principal accountable person prepares, follows, reviews and consults on. It says which building-safety decisions residents will be asked about, what they will be told, and how. Work that blocks part of the building or disrupts daily life is discussed for timing and for how to limit that disruption. A complaints procedure says how to raise a concern, how the resident will be kept informed, and what they can do if it is not resolved. Complaints and the response are retained. A request for prescribed information is met, or refused with the reason recorded.

Registration, key building information, and the certificate

An occupied higher-risk building is registered before anyone lives there. Key building information is given to the regulator and kept current. When the regulator directs it, the principal accountable person applies for a building assessment certificate and supplies whatever further information is asked for. The application, the certificate, and any notice about it are kept. Existing buildings are being called in over a period of years. The safety case is prepared anyway: the direction to apply is not the moment the duty begins.

Mandatory occurrence reporting

A system for reporting a structural or fire-safety occurrence which, left unaddressed, would present a risk of a significant number of deaths or serious injuries. The report made to the regulator, a summary of the steps taken in response, and the document that describes the reporting arrangements are kept.

The maintenance plan and the management system

A schedule of the repairs and servicing planned in order to manage building safety risks, a record of the work once it is done, and the procedures used to plan, organise, monitor and review those steps. This is the home of the programme for failed doors, untested dampers and open penetrations. An item stays visible until the work is recorded, or until a later survey shows it still open and the plan is revised.

Construction history and change control

Completion and partial-completion certificates where the regulator has issued them, the approved plans, the fire and emergency file, and the evidence of compliance with the building regulations. What the building was designed to do, and which standards it was built to. The health and safety file, refurbishment records, and information taken over from a previous accountable person. Later building work updates the same electronic facility, under change control. When an accountable person leaves, the golden thread transfers with the role. Commercially sensitive material can be withheld only where it is not significant for managing the building safely.

What has to exist in the building itself

A secure information box the fire and rescue service can open, holding the responsible person's contacts and the plans the regulations require, inspected at least annually. Wayfinding on each stair landing and in the lift lobby, readable in low light or by torch, following Approved Document B. Monthly checks of firefighting lifts, evacuation lifts and essential firefighting equipment, with faults reported. Notices in the building naming the people responsible. The box, the notices and the digital record have to agree with each other.

Competence of the people doing the work

Risk assessment, installation and repair of safety-critical work are done by people competent for that task. For a higher-risk building fire risk assessment, use an assessor on a recognised register such as the Institution of Fire Engineers or FRACS. For fire doors and firestopping, specify BM TRADA Q-Mark or FIRAS. PAS 8673 is the published benchmark for managing building safety. A programme that sends an unaccredited trade to rebuild a compartment, or that specifies a door repair outside the manufacturer's instructions, has not yet described a route back to a tested condition.

Survey, or test

Some of these duties are met by a survey or an assessment. Some are met only when a test has been carried out and the sheet is in the file. A register with no test behind it records an intention, not a result.

Fire risk assessment

Assessment

A suitable and sufficient assessment of each part, reviewed when the building, its occupancy or its protection changes, and after the surveys come back. Residents get a summary with the level of risk.

Flat entrance fire doors

Check, kept on record

Above 11 metres, at least every 12 months, using best endeavours, including the self-closer. Failed access attempts are recorded. A BS 8214 survey is what the golden thread should actually hold.

Communal fire doors

Check, kept on record

Above 11 metres, at least every 3 months, including the self-closer. This one is a straight duty, not a best-endeavours duty.

Passive fire protection

Survey

Compartment lines, cavity barriers and service penetrations, with the tested-system evidence for any firestopping. An existing wall is inspected. It is not sent away for a furnace test.

Fire and smoke dampers

Inspection and drop test

At least every 12 months under BS 9999 and BESA DW/145. Someone releases the curtain or the actuator and watches it close and latch. A damper behind a boarded ceiling has not been tested, and that fact is itself a recorded non-compliance.

Detection and alarm

Service and test

To BS 5839, including the routine tests that standard sets. A device schedule is the register. The test record is the evidence.

Emergency lighting

Test

Function tests and a full-duration test to BS 5266. A glance at a fitting is not the duration test.

Sprinklers or water mist

Inspection and test

Where a system is fitted, to the standard it was designed to, commonly BS 9251 for residential sprinklers. Confirming that heads are present is the survey. Flow, valves and pumps are the test.

Smoke control and automatic vents

Functional test

The vent operates, and the firefighter override at the entrance operates. A label on the switch is not the test.

Dry and wet rising mains

Inspection and pressure test

Visual inspection and the pressure test in BS 9990. An outlet that has never been charged has not been proven.

Firefighting and evacuation lifts

Monthly check, plus thorough examination

In a high-rise residential building the Fire Safety (England) Regulations require a monthly check, with faults reported to the fire and rescue service. The lift's own thorough-examination regime continues alongside it.

External wall

Record, and an appraisal where needed

Design and materials recorded and shared. A fire risk appraisal of the external wall where the build-up needs one. The record is updated when the wall is altered.

Structure

Assessment, or a reasoned statement

An assessment of structural building-safety risk, or a statement that explains why an assessment is not necessary. The statement has to be one a later accountable person can rely on.

Residents who need help leaving

Person-centred assessment, where requested

From 6 April 2026, identify relevant residents using reasonable endeavours, offer the assessment, and carry it out if they ask. Agree an emergency evacuation statement where you can. Review it. Share information with the fire service only with explicit consent.

A plan brings the building into compliance

Creating the common data environment, and putting the truth into it, is the first act of compliance. A gap analysis then shows which of the documents above are missing and which assets have failed. From that the accountable person can say, in writing, what has to be done. Telling someone to make an existing building fully compliant by the end of the week is not a practicable instruction. A programme that names every fail is.

The accountable person has to take all reasonable steps to prevent a building safety risk from materialising and to reduce the severity if it does. The safety case sets out the steps taken or planned, and how effective that management is or is planned to be. Immediate risk to an escape route is dealt with now: a door that will not latch onto the only stair, a compartment open onto that stair, a damper that has never been reached. The rest is sequenced so the cost is spread and each repair is done properly, inside the relevant test evidence and, for a fire door, inside the manufacturer's instructions.

The workable order is the environment first, then the population of it, then the gap analysis, then the plan, then the work. People who wait for a complete set of passes before they open a file spend longer, and more, before the regulator can see that the building is understood. A golden thread that shows a 90 percent door-fail rate, with a funded programme against every one of those doors, is a building under management. An empty folder is not.

  1. 1Create the common data environment and set who can see what. Residents see the information they must be given. The accountable person, the assessor and the surveyor see the safety file.
  2. 2File what already exists: drawings, the current fire risk assessment, certificates, old surveys and maintenance logs. Mark every prescribed document that is absent, and mark construction drawings that are being asked to stand in for as-built plans.
  3. 3Commission the gap analysis and the surveys and tests that have never been done. Record the result. A fail stays in the file with the photograph, the location and the reason.
  4. 4Write a plan that names every fail. Each item has an owner, a priority and a means of closing it. The stair door and the worn seal in a quiet lobby are both on the plan. The priority, and the date, are what differ.
  5. 5Keep the fire risk assessment and the safety case aligned with that plan. When the work is done, the record changes. When a repair fails its reinspection, the record changes and the plan picks the item up again.

Every fail has to be addressed. Every fail does not have to be addressed on the same day. What has to exist from the outset is a fail with an owner and an intended action, inside a record the right people can open.

General technical information for buildings in England. It is not a safety case, a fire risk assessment, or advice on a particular property. Check the current regulations and instruct a competent person before relying on it for a building.

How the regime is organised

The Golden Thread as a Common Data Environment (CDE)

Safety-critical building data is kept in one electronic facility, not in email threads, paper ring-binders, or scattered drives. ISO 19650 describes how to run that common data environment: agreed information requirements, a single source, revision history, and permissions so each person sees the information their role is entitled to. Residents can be given a login that shows escape procedures, fire-door instructions, and the summaries they must receive, and withholds the rest of the safety file. Every change to compartmentation, fire door specifications, fire dampers, or cladding records who made the decision, who authorised it, and what evidence supports it.

The Three Statutory Gateways

Gateway 1 (planning): a fire statement covering land-use fire safety, evacuation, and fire appliance access. Gateway 2 (before construction): building-control approval from the BSR before physical work starts. Gateway 3 (completion): a completion certificate. The building is occupied only after that certificate is issued, and the golden thread, including the as-built record, is handed to the people who will operate it. The building assessment certificate is a separate, later document. The BSR directs the principal accountable person of an occupied higher-risk building to apply for it and decides it against the safety case.

The Fire Risk Assessment (FRA) as a Living Document

An FRA used to be commissioned every few years and filed in an office. Inside the golden thread it stays current. Door-survey findings, fire-alarm changes, compartmentation repairs, and resident alterations feed it, and residents receive a summary that states the level of risk.

Safety Case Reports & The Accountable Person (AP / PAP)

The principal accountable person assesses the risk of fire spread and of structural failure and keeps a safety case report. The report describes the steps taken or planned, and how effective that management is or is planned to be. All reasonable steps are still required. A written, funded plan is how an existing building shows those steps. It is the programme that brings compliance. An immediate risk to an escape route is actioned now. The remaining fails are sequenced, and every one of them is named.

Mandatory Occurrence Reporting (MOR)

The BSR enforces mandatory reporting of structural or fire safety occurrences that, if unaddressed, would cause an imminent risk of death or serious injury to significant numbers of people. This prevents the historical suppression of safety concerns on construction sites.

Frequently asked

What is the Building Safety Regulator Golden Thread of information?

Under the Building Safety Act 2022, the Golden Thread is the kept digital record of safety-critical information for a higher-risk building — electronic, accurate, secure, and versioned — covering how the building was designed, built, and is managed for fire and structural safety. It is not a marketing folder of PDFs. The Accountable Person must retrieve as-built plans, fire strategies, door/damper/compartmentation evidence, FRAs, and change history promptly. A ring-binder of outdated drawings fails the duty even if a safety case essay exists beside it.

How does the Golden Thread relate to a Common Data Environment on higher-risk buildings?

The Golden Thread is kept as a Common Data Environment (CDE) run with ISO 19650 information-management discipline: single source of truth, role-based access, WIP/Shared/Published/Archived states, and audit trails for who changed compartmentation, doors, dampers, or cladding evidence. Residents may see escape and door instructions without the full safety file. Email threads and shared drives without permissions/version control are not a CDE. Gateways 2–3 and occupation safety cases expect that CDE to hold the current construction record.

What resident fire-door and escape-route alerts should responsible persons communicate?

Responsible persons / Accountable Persons must give residents clear information on fire doors (keep shut, no wedges, report defects), escape routes, and how to raise concerns — duties reinforced by the Fire Safety (England) Regulations 2022 and Building Safety Act 2022 resident engagement expectations. Publish accessible instructions, FRA summaries at the stated risk level, and reporting channels; log that residents received them. Silent corridors with jammed doors and no resident brief are an information failure as well as a fabric failure.

Surveyor on-site inspection checklist

Core pass/fail checks to perform on every doorset or compartmentation build (the tested doorset):

  • •Confirm building height and storey count: measured from finished ground level on the lowest side to the finished surface of the top residential floor.
  • •Verify registration with the Building Safety Regulator: all occupied HRBs in England must be registered.
  • •Check Golden Thread accessibility: can the Accountable Person retrieve as-built fire door schedules, damper test sheets, and compartmentation sign-offs in seconds?
  • •Compare drawings with the building. Flag a construction-issue set until plans of the current construction, and of the building as first constructed, are filed.
  • •Separate the resident view from the safety file. Confirm a resident can reach the evacuation procedure, fire-door instructions, and the route for reporting a concern.
  • •Audit the Fire Risk Assessment: confirm it accounts for external wall fire risks (PAS 9980 / FRAEW) and Fire Safety (England) Regulations 2022 Regulation 10 fire-door inspection registers.
  • •Review the Resident Engagement Strategy: confirm residents have clear reporting channels for fire safety concerns and accessible fire door guidance.
  • •For every failed door, damper, penetration, or missing test, confirm the plan names an owner, a priority, and the action. An unplanned fail is an open gap.

Contractor procurement & certification advice

When appointing consultants, fire risk assessors, or passive fire contractors on HRBs, the BSR expects verifiable third-party certification. Specify fire risk assessors registered with the Institution of Fire Engineers (IFE) or Warringtonfire FRACS, and contractor firms with BM TRADA Q-Mark or FIRAS passive fire protection accreditation. A remediation programme specifies repairs that stay inside the manufacturer's published method, and it names every failed asset even where the work is sequenced over more than one year.