Surveyor tools
Dew point from temperature and RH
Surface condensation forms when a surface is at or below the dew point of the adjacent air. Enter the room (or outdoor) air conditions, then check a measured surface temperature.
Dew point
10.7°C
Comfortable margin at this air temperature. Condensation still forms on any surface colder than the dew point — measure the surface, not only the room air.
- Margin to saturation
- 9.3 K
- Absolute humidity
- 9.5 g/m³
- Vapour pressure
- 1283 Pa
- Saturation VP
- 2333 Pa
Surface at 14.0°C
Stays dry
Surface is 3.3 K above dew point (10.7°C) at these air conditions.
Magnus approximation for surveyor triage — not a BS 5250 Glaser or WUFI run. In Thailand, outdoor monsoon air often has a dew point near 30°C; cooling a masonry bedroom wall to 22°C puts that wall below dew point and drives reverse condensation behind vinyl.
Frequently asked
Given room temperature and RH, what is the dew point and will this wall surface condense?
Dew point is the temperature at which that air’s vapour becomes saturated. If a measured surface (glass, corner, cold bridge) is at or below dew point, condensate forms — the BS 5250 surface-condensation mechanism. Enter air dry-bulb and RH, compute dew point (Magnus or equivalent), then compare to a surface thermometer reading. Streaming glass in January with dry wall cores is condensation, not a failed DPC (BRE Digest 245). Fix extract (Approved Document F), background heat, and cold bridges before coatings. In hot-humid reverse-drive rooms, also compare outdoor dew point to cooled inner surfaces.
Related reading: surface condensation, tropical reverse condensation, hygroscopic chimney salts.