Soft Landings and FM handover failures
Soft Landings (BSRIA) is a graduated handover framework: design for operability, commission properly, support the facilities team after occupation, and feed performance gaps back into future briefs. It complements ISO 19650 asset information duties and COBie structured handover. Without it, buildings open with empty O&M portals, unlabelled plant, and fire strategy PDFs nobody can find — the opposite of a Golden Thread. This page is for clients and managing agents who inherit orphans.
Principles & methodology
Aftercare is part of delivery
Soft Landings budgets time after occupation for fine-tuning and training. Cutting that line item recreates year-one chaos.
Information acceptance tests
Treat AIM/COBie completeness like snagging: sample assets, check serials, confirm fire-door schedules match the floor.
FM must sit in the brief
Operators who first see the building at PC cannot salvage a missing AIR. Invite FM into Exchange Information Requirements.
Common failure pile
Unlabelled valves, contradictory as-builts, no login for BMS, and damp ‘guarantees’ filed instead of envelope drawings.
Public clients have Playbook expectations
UK Construction Playbook and UK BIM Framework push outcome-based information — Soft Landings is how outcomes meet operators.
Practical application & surveyor advice
Put Soft Landings stages in the programme and contract. Require O&M/AIM acceptance before releasing final retention. Train named FM staff on fire strategy and critical plant before the contractor demobilises.
Frequently asked
What is Soft Landings?
BSRIA Soft Landings is a graduated handover and aftercare framework so design intent survives into operation and feedback returns to the client. It complements ISO 19650 AIM duties and COBie (BS 1192-4) — it is not a substitute for Building Regulations completion certificates.
Why do FM teams inherit empty asset registers?
Because Asset Information Requirements were never written or accepted, so Project Information Models never became a maintained AIM. Put AIR and Soft Landings aftercare in the appointment (UK BIM Framework / Construction Playbook). Building Safety Act Golden Thread expectations make missing fire asset data especially costly on relevant buildings.
Is Soft Landings only for government projects?
No. Public clients are nudged by the Construction Playbook, but private owners benefit whenever complex plant and fire systems need trained operators. Size aftercare to complexity — a boiler swap needs less than a hospital, but both need named information stewards under ISO 19650-3 thinking.
Academic & institutional context
BSRIA Soft Landings framework; ISO 19650-3 operational information management; BS 1192-4 COBie; UK BIM Framework; Building Safety Act Golden Thread expectations on relevant buildings.