A known pattern These load a real combination so you can see how the reading behaves. They are not your building.
Mould in the corners of a solid-brick bedroom A tide mark after the patio was raised Horizontal cracks in a 1960s cavity wall Rust on a concrete column Mould behind vinyl in a cooled Bangkok bedroom Spray foam on pitched roof rafters Ceiling stain along a lean-to roof abutment Only a moisture-meter reading
Place Groups are climate and building tradition — not a national code book. Country names such as England or Thailand still resolve to the matching group.
Not sure UK & Ireland Southeast Asia North America Hot-arid
Construction type If you are unsure, leave it blank. Naming it removes mechanisms that construction cannot have.
Not sure Solid brick walls — UK & Ireland Solid stone walls — UK & Ireland Early uninsulated cavity walls — UK & Ireland Insulated cavity walls — UK & Ireland Timber frame, including brick slips — UK & Ireland Concrete block walls — UK & Ireland Internal partitions — UK & Ireland No-fines concrete — UK & Ireland System-built and designated PRC houses — UK & Ireland Suspended timber ground floors — UK & Ireland Ground-bearing concrete floors — UK & Ireland Cold pitched roofs — UK & Ireland Flat roofs — UK & Ireland Concrete frame with masonry infill — Southeast Asia Raised timber & bamboo vernacular — Southeast Asia Southeast Asian shophouses (Thai Hong Thaeo / Cambodian Pteas Tiam / Vietnamese tube house) — Southeast Asia Light timber platform frame — North America Concrete masonry (CMU) walls — North America Insulated concrete form (ICF) walls — North America Adobe & high-mass earthen walls — Hot-arid / desert Thick masonry courtyard houses (fired brick, stone, block) — Hot-arid / desert Basements and below-ground accommodation — UK & Ireland External wall insulation (EWI) and thick render systems — UK & Ireland Green roofs and podium decks — UK & Ireland Where it is Height and place rule out more mechanisms than a meter does.
A damp band rising from the floor, fading out below about a metre Ground storey only. Not a patch halfway up the stairs. Patches well above the floor, or isolated in the middle of a wall Rising damp does not start at picture-rail height. Staining on a ceiling, or spreading down from a roof or a flat above Brown marks with a tide edge are liquid water. Mould in a cold corner is not. The mark is on a chimney breast Especially upstairs, where rising damp cannot be the storey. Ceiling staining along the sloping line where a lean-to or conservatory meets the wall The mark follows the pitch of the extension roof, and it appears with wind-driven rain.
When it appears Rain, cold weather, and humid weather are different causes.
Clearly worse during or just after wind-driven rain Then it slowly dries. A shower should not operate a damp-proof course. Worse in cold weather, and not especially after rain Winter bedrooms and north walls. Black mould in corners, behind furniture, or around windows Ground salts tend to suppress mould. A mouldy wall is a clue against simple rising damp. Windows or sills running with water in the morning The glass is telling you the air, not the foundations. A horizontal tide mark with a salt crust Crust and crystals, not just a shadow in the paint. A fixed patch looks damp in humid weather and fades when the air is dry No obvious leak, and it does not wait for rain. The damp lines up with a gutter, a downpipe, a crack, or a joint Stand outside and look at the stain from the other side of the wall. Musty smell, springy boards, or soft timber at a ground floor Mostly suspended timber. A concrete slab does not go springy. Water ponds on a flat roof for more than a day or two after rain Standing pools, soft deck underfoot, or ceiling stains that map to the ponds.
Cracks and movement The shape of a crack is a clue. One crack is not a foundation design.
Horizontal cracks in the mortar beds, repeating up the wall Often every few courses. Not a single diagonal over a door. The outside leaf is bowing, leaning, or has lifted near the eaves Look along the wall from one end. Diagonal cracks, wider at the top, with doors or windows sticking One crack over one lintel is not this. Look at the whole bay. Cracks wider toward the bottom, or paths and cills lifting Think about whether a tree was removed, not only whether a tree exists. Cracks run along the junction of a concrete column or beam and the wall panel The crack draws the frame. It does not cut diagonally across the panel from the ground. Concrete is cracking or falling off, with rust stains or steel showing The crack follows the bar, not the brick joint. The cracks appeared years ago and have not grown Dated photos matter more than memory, but a long stable crack is evidence.
What changed Patios, cavity fill, trees, and coatings are the usual recent causes.
Soil, a path, a planter, or render crosses the damp-proof course Outside ground should finish about 150 mm below the course. The cavity was filled with insulation, and damp showed up afterwards Timing is the clue. Condensation from new windows can share that timing. Hard cement render, cement pointing, or waterproof coating on an old solid wall The coating stands proud and the brick or stone behind it is bursting. A tree or large shrub is close, and movement worsened after dry weather Clay soils. On sand, a tree is usually a red herring. A sizeable tree was removed and the movement came afterwards Heave can take more than one season to show. Staining under an air-conditioner, a condensate pipe, or a bathroom fitting Look up. The stain usually has an address. Spray foam has been sprayed onto the underside of the roof or rafters Yellow, cream, or grey foam stuck to rafters or felt. Often flagged by a mortgage valuation. Mould or peeling paint behind vinyl wallpaper in a heavily air-conditioned tropical room Hot-humid climate, AC set cold, impermeable wallcovering. Not a ground-floor tide mark. Timber sounds hollow, with mud tubes or discarded wings Tubes on posts and walls. Common in Thailand. Not a routine English diagnosis. The only evidence so far is a high reading on a handheld moisture meter Meters respond to salts. They do not name a mechanism.
Clear Copy this reading