Skip to content

Free symptom checker

What can this pattern be?

Pick the place, the construction if you know it, and what you can see. The list that comes back ranks likely causes to check — not a survey of your building, and not a reason to buy the first product named.

A known pattern

These load a real combination so you can see how the reading behaves. They are not your building.

Place

Groups are climate and building tradition — not a national code book. Country names such as England or Thailand still resolve to the matching group.

If you are unsure, leave it blank. Naming it removes mechanisms that construction cannot have.

Where it is

Height and place rule out more mechanisms than a meter does.

When it appears

Rain, cold weather, and humid weather are different causes.

Cracks and movement

The shape of a crack is a clue. One crack is not a foundation design.

What changed

Patios, cavity fill, trees, and coatings are the usual recent causes.

No pattern yet

Choose what you can actually see. Height, rain or cold weather, and the construction do more than a product name.

Construction on the record: Insulated concrete form (ICF) walls.

General technical information — not a survey, a specification, or advice on a particular property. The same stain can have more than one cause. A repair that is established for one of them can damage the building if the cause is wrong. Instruct a competent local professional before opening up structure or paying for a remedy.

Nothing is ranked yet. Pick the height of the mark and whether it follows rain or cold weather. If you know the wall, say so — brick slips, a cavity, and a concrete frame do not share a remedy list.
Check a symptom · Buildopedia