Collateral warranties — plain English for clients and agents
A collateral warranty is a separate contract that gives a third party (often a funder, purchaser, or tenant) direct rights against a designer or contractor who otherwise only contracted with someone else. It is a staples of UK development finance and forward sales. It is not a moisture diagnosis, not a Section 20 consultation, and not an insurance-backed damp guarantee. Procurement still has to define scope and information duties (ISO 19650 / UK BIM Framework where used). This page is literacy for non-lawyers — solicitors draft the deed.
Key points
Third-party rights without rewriting the main contract
The building contract sits between employer and contractor. A warranty lets a bank or buyer sue the warrantor for defined breaches as if they had a direct appointment — within the warranty’s limits.
Typical warrantors
Contractors, key consultants, and sometimes critical subcontractors. Net contribution clauses and caps are negotiated hard.
Not a performance bond
Bonds secure payment/performance obligations differently. Do not use the words interchangeably — see the performance-bonds topic on this site.
Information duties still need drafting
A warranty that is silent on as-built data will not conjure COBie. Write Exchange Information Requirements into appointments (Construction Playbook / ISO 19650 logic on public work).
Limitation and step-in
Funders care about step-in rights and limitation periods. Those clauses are legal engineering — not encyclopaedia DIY.
Frequently asked
What is a collateral warranty in plain English?
It is an extra contract giving a third party (such as a funder or buyer) direct rights against a contractor or consultant who originally contracted with someone else. It is not a damp guarantee and not ISO 19650 by itself — scope and information duties still need drafting (UK BIM Framework / Construction Playbook context on public projects).
Is a collateral warranty the same as PI insurance?
No. Professional indemnity insurance responds under its policy terms; a warranty creates contractual rights. You often need both aligned — Landlord and Tenant Act Section 20 politics on a block still sit on a different track.
Does this reference draft warranty deeds?
No. Explain the concept, then send humans to construction solicitors. Inventing step-in or net-contribution wording is how deals break — keep ISO 19650 information duties and Landlord and Tenant Act Section 20 tracks separate from deed drafting.
Practical checklist
- •List who needs warranties (funder, purchaser, occupational tenant).
- •Align warranty schedule with the actual consultant/contractor team.
- •Check professional indemnity triggers with brokers — not only the deed title.
- •Keep warranties distinct from product guarantees and NHBC covers.
- •Instruct construction solicitors before circulating ‘standard’ forms on a live deal.
- •For leasehold blocks, do not confuse warranties with Landlord and Tenant Act Section 20 process.
Notes for readers
Third-party rights are contractual protections for people who are not parties to the main building contract. This page is not legal advice and does not mark up deeds — ask your solicitor who must warrant whom before the loan agreement freezes the schedule.