Retention release and defects liability periods
Retention withholds part of the contract sum to motivate completion and defect correction. A defects liability (or rectification) period sets a window after practical completion when the contractor must return to fix listed defects. Clients and leaseholders often confuse retention with performance bonds, insurance-backed guarantees, and NHBC warranties. Procurement still needs clear certification of practical completion and making good. On residential blocks, explain retention lines in Section 20 materials so residents understand why money is held. This is literacy — not advice on a live payment dispute.
Key points
Retention is withheld contract money
Typically released in stages (e.g. at PC and after making good). Exact percentages and triggers sit in the contract form (JCT/NEC families differ in mechanics).
Defects liability is a time box
It is not an endless warranty of suitability. Latent defects may sit on other legal tracks (including Defective Premises Act contexts) with different limitation rules.
Certification matters
Who certifies PC and making good (CA, Employer’s Agent, NEC Project Manager) controls release. Informal ‘it looks fine’ emails create disputes.
Not a bond and not a product guarantee
Bonds bring sureties; product guarantees cover defined products. Retention is still the contractor’s money held back.
Leasehold transparency
Managing agents should show retention logic in major-works cashflow so Landlord and Tenant Act Section 20 consultations are not accused of hiding pots of cash.
Frequently asked
What is retention in a building contract?
It is a percentage of the contract sum withheld to motivate completion and defect correction, usually released in stages after practical completion and making good. It is not a performance bond and not an insurance-backed damp guarantee — Landlord and Tenant Act Section 20 materials should name it plainly on block works (LEASE guidance).
Does the defects liability period cover every future leak?
No. It is a defined window for correcting defects notified under the contract. Later latent issues may involve other claims and limitation rules (including Defective Premises Act contexts under Building Safety Act limitation reforms). Keep snag lists tight during the period; do not treat expiry as proof the building is forever dry — Landlord and Tenant Act Section 20 blocks still need transparent defect reporting to residents.
Who decides when retention is released?
Usually the contract administrator / Employer’s Agent / NEC Project Manager through certification under the form. Demand written certification and defect closure evidence — UK BIM Framework / ISO 19650 information acceptance is a useful parallel discipline, and Landlord and Tenant Act Section 20 cashflows should show the release logic (LEASE guidance).
Practical checklist
- •State retention % and release milestones in the tender.
- •Diary defects liability end dates after PC.
- •Keep a written snag/defect list with closure evidence.
- •Do not release final retention without making-good certification.
- •Explain retention vs contingency in resident communications.
- •Take QS/solicitor advice before set-off fights on a live account.
Notes for readers
Retention is money held back against making-good; the defects liability period is the window to notify incomplete or defective work. This page is not authority to release payments — align retention release with inspected making good. Construction Playbook-era discipline still means evidenced outcomes.