Skip to content
Established

Below-ground waterproofing repair (BS 8102)

Investigate and reinstate a designed basement waterproofing strategy — barrier, structurally integral, and/or drained cavity with maintained sumps — to a chosen water-resistance grade.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

Habitable or critical below-ground space needs a defined dryness grade under BS 8102, with junctions, penetrations, and maintenance access designed.

When it fails or causes harm

A cement skim is painted on an actively leaking wall, sumps are abandoned, or chemical DPC language is used as the basement strategy.

Frequently asked

Can a chemical DPC replace a failed basement tanking system?

No. Below-ground waterproofing is designed to a water-resistance grade under BS 8102 (Type A barrier, Type B integral, and/or Type C drained cavity with maintained sumps). Chemical DPC practice under BS 6576 addresses rising damp in walls above the usual ground moisture band — not hydrostatic basement grades. Reinstate or redesign the BS 8102 strategy; do not inject a living-room DPC product as the basement repair.

Mechanisms it is attached to