Skip to content
Caution

Positive input ventilation

A loft or wall unit that blows air into the house and relies on it leaking out. It can lower humidity in some airtight homes. It is not a substitute for extract in wet rooms.

Heavily marketed, known to harm traditional fabric, or supported mainly by people who sell it. Not never — not a first recommendation.

When it works

A designer has already provided real extract, the loft is suitable, and the unit is not pushing moist air into a cold roof or a timber frame. Even then it is an extra, not the diagnosis.

When it fails or causes harm

It is sold as a cure for rising damp, penetrating damp, or a wet subfloor. In a leaky house it does little. In a tight house with cold voids it can drive moisture into the place you least want it. Most of the enthusiastic evidence is from people who sell the units.

Frequently asked

Is positive input ventilation an established cure for all damp, or only conditional?

Conditional at best, and never a cure for rising damp, penetrating damp, or a wet subfloor. PIV can lower whole-house humidity in some airtight dwellings after real extract exists (Approved Document F), but loft units can also drive moist air into cold roof voids if the loft is unsuitable — a BS 5250 risk. Evidence grade on this site is caution: much marketing outruns independent proof. Specify extract at wet rooms first; treat PIV as an optional extra only after construction and mechanism are named. Refuse PIV sold against a meter reading at skirting level.

Mechanisms it is attached to