Skip to content
Established

Retrofit stepped cavity trays with stop-ends & weep vents

Carefully removing outer-leaf bricks along the diagonal pitch of a lean-to roof abutment, inserting preformed polypropylene or Code 4/5 lead stepped cavity trays with welded stop-ends, and installing weep hole vents at the lowest point to drain penetrating cavity water safely onto roof flashings.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

Damp staining appears on internal ceilings along the sloping junction line of an extension or conservatory roof following wind-driven rain. Water penetrating the outer brick leaf above the roofline is safely intercepted before it can bridge down to the inner leaf.

When it fails or causes harm

Contractors merely inject clear silicone sealant or re-dress lead cover flashings on the external brick face. External lead flashings stop surface runoff, but they cannot stop water that has already soaked into the brickwork and is running down inside the cavity.

Mechanisms it is attached to