Manage termites and the damp timber they are eating
Termites need food and, usually, moisture and a hidden path. The repair is a licensed inspection, removal of decayed structural timber where an engineer says so, and a change to the detail that keeps the timber damp and in contact with the ground. A shop spray is not a structural repair.
It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.
When it works
Mud tubes, hollowed timber, or discarded wings are present, and the treatment is specified for the species and the building. The leak, the buried post, or the enclosed undercroft is fixed at the same time.
When it fails or causes harm
Every piece of soft timber in a monsoon climate is called termite damage without looking, or a chemical is flooded through a house that has a plumbing leak and sound wood. England does not have Thailand's subterranean termite pressure; do not import the diagnosis with the climate.