Keep the timber-frame cavity drained and ventilated
A timber frame stays sound when rain on the cladding drains and ventilates in the cavity, the breather membrane can pass vapour, and the vapour-control layer on the warm side is continuous. Brick slips and a brick outer leaf are both claddings. Neither is a solid wall.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
Staining, a musty smell, or soft sheathing sits behind a cladding of brick, slips, boarding, or render on a timber frame. The repair restores the drained cavity, the membranes, and the openings at head and base. It does not include injecting the cladding.
When it fails or causes harm
Someone treats the brick face as Victorian solid wall: cement render over the vents, a chemical damp-proof course in the slips, or foam that fills the cavity the frame was relying on.