Balanced tropical building physics: inward drying & sensible AC cooling
Removing non-breathable vinyl wallpaper from air-conditioned rooms, ensuring external renders have breathable micro-porous coatings, and setting air conditioners to sensible comfort levels (25°C–26°C with dehumidification mode) to avoid reverse vapor drive condensation.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
Moisture and mould develop on internal wall surfaces or within the masonry core behind heavily cooled bedrooms in hot-humid tropical climates (e.g. Thailand). Ambient 35°C air at 85% RH has a dew point around 30°C; cooling a wall below 25°C creates an inward condensation trap if the wall cannot dry.
When it fails or causes harm
Landlords apply thick plastic waterproof coatings on internal walls to 'seal away' mould, which only pushes the condensing boundary deeper into the masonry, causing render debonding and hidden structural decay.