Skip to content

Guide · UK & Ireland

Radon in UK dwellings — test, protect, do not guess

What radon is, when to test, how Building Regulations address new work in affected areas, and why radon is not cured by a damp-proof injection.

  1. 1

    Know the hazard

    Radon is a naturally occurring radioactive gas from rocks and soils. Indoors it can accumulate, especially in affected parts of the UK. UKHSA publishes atlases and testing advice — use those, not folklore.

  2. 2

    Testing beats assumption

    Indicative maps guide risk; a proper test measures the dwelling. Do not skip testing because the neighbour ‘never bothered’.

  3. 3

    New work and Approved Document C

    In radon-affected areas, new dwellings and relevant extensions/conversions need appropriate protection (membranes, sumps, ventilation strategies) under Building Regulations Approved Document C routes.

  4. 4

    Remediation principles

    Existing homes may need sumps, positive ventilation, or sealing of routes from the ground — specified after measurement. Chemical DPC products do not address radon.

  5. 5

    Keep radon separate from damp diagnosis

    Musty smells and mould are moisture problems (BS 5250 / fabric). Radon is a different measurement and remedy path. name both if relevant; do not conflate them in one quote.