Skip to content
Established

Replace corroded cavity wall ties

When ties have corroded or were never adequate, the outer leaf is no longer reliably connected. The established repair is a survey of the ties and installation of remedial stainless ties, isolating the old ones where the specification requires it.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

The wall is an early cavity wall, cracks follow the tie courses, the leaf is bowing, and opening up or a borescope shows corroded metal. BRE Good Repair Guide 4 is the inspection and repair outline.

When it fails or causes harm

The building is solid brick, timber frame, or a recent cavity wall with stainless ties and ordinary thermal cracks. Selling tie replacement from the pavement, without confirming there is a cavity and that the ties are failing, is not this remedy.

Mechanisms it is attached to