Manage trees on shrinkable clay, do not fell in a panic
Trees and large shrubs take water from clay and the ground shrinks. That can be subsidence. Cutting the tree down can let the clay swell, which is heave, often more damaging. Management is an arboricultural and engineering decision.
It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.
When it works
The soil can shrink and swell, a tree is close enough to matter, and the crack pattern and timing fit seasonal movement. Pruning, root barriers, or a designed removal can all be right. The point is that the choice is designed.
When it fails or causes harm
A tree is felled because it is near a crack, on sandy soil that does not shrink, or without asking what the clay will do when the water demand disappears. It also fails when the cause was a broken drain and the tree was a bystander.