Repair a broken vapour-control layer
Warm moist air that gets into a cold frame or a cold roof condenses there. The repair is continuity of the vapour-control layer, and often less insulation stuffed into a vent path. It is conditional on the build-up actually being a cold-side condensation problem.
It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.
When it works
Inspection or a known detail shows warm air reaching a cold deck, a rafter void, or the back of sheathing. Bath fans that dump into the loft are a common version.
When it fails or causes harm
A vapour barrier is added to the wrong side of a traditional solid wall, or to a wall that is being wetted by rain. Trapping water is worse than the condensation it was meant to stop.