Skip to content

Guide · UK & Ireland

Drain CCTV and underground drainage investigation

When to camera the drains, what CCTV can and cannot prove, and how underground failures present as ‘damp’ or garden sinkholes.

  1. 1

    Match the symptom to a drainage hypothesis

    Recurring wet patches along the drain run, gurgling, sewage odours, sinkholes in soft ground, or washout under a bay often justify CCTV. Random filming with no hypothesis wastes money.

  2. 2

    What CCTV shows

    Fractures, open joints, root ingress, bellies, collapses, and illegal connections — when the camera can pass. It does not magically map every land drain or prove a wall damp is ‘the drain’ without a connecting path.

  3. 3

    Combine with levels and dye where needed

    Water tests, dye, and drain location relative to foundations matter. A cracked pipe three metres from a dry wall is not automatically the indoor damp cause.

  4. 4

    Shared drains and responsibility

    On estates and terraces, know where the private drain ends and the sewer undertaker’s asset begins before promising repairs. Block management and neighbour law may sit beside the technical fix.

  5. 5

    After the film

    Specify lining, excavation, or patching from the defect class — and reinstate falls. Building Regulations Part H / BS EN 12056 thinking still governs new work; CCTV is investigation, not a design code by itself.