Guide · UK & Ireland
Prepare a householder planning application in England
A homeowner and agent sequence: confirm England, test permitted development, then assemble drawings, certificates, and statements for validation — without confusing planning with Building Regulations.
- 1
Confirm you are in England and name the host house
This guide is England GPDO / TCPA practice. Scotland, Wales, and Northern Ireland differ. Record whether the building is a house (not a flat), whether it is listed, in a conservation area, on Article 4 land, or otherwise designated. Photograph the street and measure the existing rear wall — ‘original house’ for PD is the house as first built or as at 1 July 1948.
- 2
Test permitted development before you pay for a full local list
Many single-storey rear extensions fall under GPDO Class A within depth and height limits, with prior approval for larger extensions outside certain designations. Lofts, outbuildings, and porches have their own classes. If PD clearly fits, you may still need Building Regulations and party-wall notices — PD is not ‘no control’. If PD is doubtful, plan for express householder planning permission.
- 3
Separate Building Regulations and party wall from day one
Open a parallel track for building control (local authority or registered building control approver) and, where England/Wales excavations or shared walls apply, Party Wall etc. Act 1996 notices. A planning grant does not size the steel or satisfy Part B fire. See also /planning/planning-and-building-control and /guides/extension-england.
- 4
Assemble the national drawing set
Location plan on an OS base, block/site plan, existing and proposed floor plans, and elevations — metric scales, north arrow on plans, scale bar preferred. Match titles to the proposal. Avoid ‘do not scale’ disclaimers that trigger validation refusal. Add sections or street scenes when height or roof form is the issue.
- 5
Complete ownership certificate and check statement triggers
Every application needs the correct ownership certificate and agricultural land declaration. Add a Design and Access Statement when required (listed building consent, major development, certain conservation-area schemes). Add heritage, flood, tree, or ecology documents when the local list or site conditions demand them — do not invent empty statements.
- 6
Read the local list and fee before submission
Download the local planning authority’s validation checklist. Missing local-list items bounce the application. Pay the correct fee via Planning Portal or the authority. Keep a submission pack index so revisions stay coherent.
- 7
Expect publicity, then a decision notice — then still do building control
Neighbours may be consulted. Conditions can control materials, obscure glazing, or landscaping. After grant (or PD confirmation), finish Building Regulations details and any party-wall awards before opening the wall. File decision notices and completion certificates together for the next sale.