Roof underlays — bitumen felt vs breathable membranes

How underlays manage water and vapour in pitched roofs — and why swapping felt for a membrane (or sealing a cold roof) changes condensation risk.

  1. 1

    Name the roof as cold or warm

    Cold roofs need eaves-to-eaves (or ridge) airflow above the insulation. Warm roofs put insulation above the deck with a different vapour strategy. The underlay’s job depends on which you have (BS 5250 / NHBC loft condensation guidance).

  2. 2

    Bitumen felt behaviour

    Traditional reinforced bitumen underlays are relatively vapour-tight. They shed water that passes the covering but can trap vapour if the loft airflow is blocked or spray foam seals the underside.

  3. 3

    Breathable (vapour-permeable) membranes

    Modern HR underlays allow more vapour out while still shedding water. They are not a licence to block eaves vents or ignore a vapour control layer where the design requires one.

  4. 4

    Common failure pairings

    Membrane with stuffed eaves; felt with sealed soffits; spray foam against either underlay. Investigate airflow and covering leaks before blaming the membrane brand alone.

  5. 5

    Replacement rules of thumb

    When re-covering, match underlay to the ventilation and insulation strategy on the drawings — not to whatever was on the van. Record product and ventilation path for the next surveyor.