Skip to content
Established

Find and repair the leak

Plumbing, roofs, flat roofs, and condensate pipes produce stains that look like 'damp'. The repair is the pipe, the covering, the outlet, or the flashing. Drying comes after the water has stopped.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

The stain has a shape that starts at a fitting, a ceiling below a bathroom, a valley, or an air-conditioner, and it tracks recent water rather than a seasonal cold surface.

When it fails or causes harm

The search stops at the first wet patch and misses a second path. A roof leak and condensation can exist in the same house. Fixing a tile does not cure mould on the window boards.

Mechanisms it is attached to