Skip to content

Guide · UK & Ireland

Flood recovery and drying — fabric first

After clean or contaminated flood water: strip, dry, and verify moisture before reinstatement — so mould and trapped wet insulation are not built back in.

  1. 1

    Health and contamination first

    Sewage-contaminated water changes PPE, strip-out, and disposal rules. Do not treat every flood as clean rainwater. Follow current public-health and insurer guidance for category of water.

  2. 2

    Remove what cannot dry in place

    Saturated gypsum boards, quilt insulation, and composite floors often need removal. Painting over wet fabric traps moisture and salts.

  3. 3

    Dry with measurement

    Use drying equipment with logged moisture readings in timber and masonry — not guesswork. Compare like materials; salts affect conductance meters (Digest 245 caution still applies).

  4. 4

    Find why water entered

    Drainage surcharge, failed defences, appliance leaks, or river flood each suggest different prevention. Reinstatement without addressing entry repeats the loss.

  5. 5

    Reinstate with breathable logic where appropriate

    On traditional solid walls, prefer compatible plasters and finishes that can dry. Modern tanking of an above-ground flood line without diagnosis recreates moisture traps.