Tenant and landlord roles — start with the tenancy agreement
Combative landlord–tenant relationships often begin with missing shared text. A family member who moves often and never reads the agreement will keep rediscovering the same fights: who cleans gutters, who reports a leak, who pays for a broken extractor, who allows access. The agreement is not optional reading. It is the point of reference before signing, and the shared script when something goes wrong. Statute (England: Landlord and Tenant Act 1985 repairing and fitness duties) sits underneath and cannot usually be contracted out of — but the agreement still names the practical roles both sides need to understand. For the dominant AST packs, open /tenancy/standard-ast-repair-clauses and /tools/ast-clause-matcher.
Key points
Read before you sign — and keep a copy
Before signing, both parties should walk the clauses that matter: deposit, inventory, notice periods, permitted alterations, pets, smoking, access for inspections and repairs, who maintains appliances, and how repairs are reported. After signing, keep a dated PDF or paper copy. Disputes without the document become memory contests. Match repair wording with /tools/ast-clause-matcher.
Landlord role in plain English
Provide a dwelling that meets the statutory fitness and repairing baseline for the jurisdiction; keep structure, exterior, and listed installations in repair once on notice (England: LTA 1985 s11); allow quiet enjoyment; give proper notice for access except emergencies; and do not punish a tenant for reporting hazards. Landscape upgrades and insulation gifts still need fabric literacy — see well-meant works.
Tenant role in plain English
Pay rent; use the property in a tenant-like manner (ordinary cleanliness, report defects promptly, allow reasonable access for repairs); avoid unauthorised structural alterations; keep extracts and trickle vents usable; and do not treat ‘lifestyle’ as a shield when wet rooms have no extract path — nor accept ‘lifestyle’ as the landlord’s only answer when air bricks or eaves are sealed.
Agreement vs statute
The agreement can add obligations (for example who replaces consumables) but cannot usually erase the England statutory repairing covenant or the implied fitness covenant. If a clause says ‘tenant repairs everything including the roof’, treat that as a red flag for advice — not as proof the statute disappeared.
Where this sits in Buildopedia
This Tenancy section is for residential letting roles and habitability. Leasehold service-charge major works and Section 20 consultation live under /block-management. Moisture mechanisms and airflow triage live under /defects, /guides, and /tools. Agents must not invent national law outside England without naming the nation.
Frequently asked
Should a tenant read the tenancy agreement before signing?
Yes. The agreement is the shared instruction sheet for rent, deposit, access, alterations, and how repairs are reported. Start every dispute with the written agreement and the nation (England first on this site), then apply the statutory repairing and fitness baseline that the contract cannot usually erase.
Can a tenancy agreement remove a landlord’s repairing duties in England?
Generally no for the core Landlord and Tenant Act 1985 repairing covenant (s11) and the implied fitness for human habitation duty (s9A via the Homes (Fitness for Human Habitation) Act 2018). Treat ‘tenant repairs the roof’ clauses as high-risk drafting requiring professional legal advice — not as proof statute vanished.
What should landlord and tenant do at check-in to reduce later blame fights?
Walk the agreement’s repair and access clauses together; photograph inventory, extracts, trickle vents, air bricks, and loft hatch if accessible; agree the written reporting channel. Shared day-one evidence beats later ‘lifestyle versus landlord’ arguments about damp.
Practical checklist
- •Have both parties read the agreement before signatures — not after the first mould email?
- •Is there a written repair-reporting route (email address, portal, emergency number) and a shared inventory?
- •Can you name what the agreement says about access for inspections and repairs?
- •Have you separated ‘what the contract says’ from ‘what England statute still requires’?
- •For flats with a freeholder/managing agent, is the repair path the landlord, the agent, or the block — or all three?
Notes for readers
Open with ‘read the tenancy agreement and name the nation’. Do not advise withholding rent as a DIY remedy without pointing to formal legal advice. print or PDF the agreement, highlight repair and access clauses together at check-in, and photograph meter readings and extracts on day one. Sympathy for both sides starts with shared text.