Skip to content
Tenancy/Guidance

Standard AST repair clauses — Gov Model, NRLA, OpenRent, ARLA, DIY

Most private lets in England used one of a handful of Assured Shorthold Tenancy packs: the UK Government Model Agreement, NRLA standard forms, OpenRent’s platform AST, Propertymark/ARLA agent agreements, or generic Lawpack-style stationery. The repair clauses look different on the page but meet the same statutory floor. This topic points to the machine-readable index (`/data/tenancy-templates.json`), the plain-English guide in Guides (`/guides/standard-ast-repair-clauses`), and the free matcher (`/tools/ast-clause-matcher`). Inspection principle: clauses that try to transfer structural, exterior, or mechanical ventilation/heating maintenance to the tenant are void to that extent under LTA 1985 s11, Fitness 2018 / s9A, and Consumer Rights Act 2015 s62.

Key points

Five families, one statutory floor

Gov Model D3 restates s11 almost verbatim. NRLA, OpenRent, and ARLA packs mirror the same landlord repairing covenant with different numbering and agent notice addresses. DIY packs are where over-broad ‘tenant keeps the whole property in repair’ lines appear — treat those as red flags, not gospel.

Tenant-like care is real — and limited

Gov Model C4.1 and cousins require reasonable ventilation, heating, cleanliness, and prompt notice. That is ordinary care. It does not make the tenant the roofer, guttering contractor, or boiler engineer. Distinguish ‘clean the extract grille’ from ‘replace the fan unit’.

Paste the clause, get duties and overrides

Use /tools/ast-clause-matcher to select a template or paste wording. Output: plain English, landlord duty, tenant duty, statutory override, action step. Dataset themes include unfair_shift for DIY boiler/gutter dumps.

Renters’ Rights Act context

From 1 May 2026 England private ASTs converted to assured periodic tenancies. Households still hold AST-era PDFs; repair-clause literacy still decides damp and disrepair fights. Always name the nation before quoting English forms abroad.

Cross-links into building defects

After the clause is clear, open damp-without-blame and loft/subfloor triage when mould is the symptom. Agreement literacy without building science recreates the lifestyle-versus-landlord deadlock.

Frequently asked

Where does Buildopedia index standard UK AST repair clauses?

In /data/tenancy-templates.json (five template families), /guides/standard-ast-repair-clauses, and the interactive /tools/ast-clause-matcher. Map contract text to plain English and statutory override before assigning blame for damp or disrepair.

What is the inspection principle for AST repair clauses?

Contractual clauses attempting to transfer structural, exterior, or mechanical ventilation/heating maintenance that statute places on the landlord to the tenant are void or unenforceable to that extent (LTA 1985 s11; Fitness 2018; CRA 2015 s62). Tenant-like care remains; structural dumps do not.

Is the Government Model AST still useful after ASTs converted in England?

Yes as a clause literacy baseline. England private ASTs converted to assured periodic tenancies from 1 May 2026, but households still hold Model-style repair wording and s11/fitness duties continue. Read the PDF you have; apply current statute; use the matcher for plain English.

Practical checklist

  • •Can you name which template family your PDF most resembles?
  • •Have you highlighted repair, care, notice, and any ‘tenant maintains boiler/gutters’ lines?
  • •Have you run the clause through /tools/ast-clause-matcher?
  • •Does any line conflict with LTA 1985 s11 or Fitness 2018?
  • •For mould: have extracts/vents been checked and building airflow (eaves/air bricks) named?

Notes for readers

Load /data/tenancy-templates.json or POST /api/v1/tools/ast-clause-matcher; never treat a DIY ‘tenant repairs all’ clause as displacing s11. photograph the clause page, match it, send dated notice, then use building-defect tools for damp.