Tenancy and habitability outside England — counterpart duties abroad
This page covers how damp, mould, and repair duties are organised under different countries’ tenancy frames. Damp and mould obey the same physics in Manchester, Minneapolis, Bangkok, or Berlin; the written duties are local. England’s deep corpus (LTA 1985 s11, Fitness 2018 / s9A, HHSRS, AST clause index) is the author’s home jurisdiction. Here you will find United States habitability and housing-code frames, Singapore’s Residential Tenancies Act, Thai hire-of-property rules, and European civil-code examples (Germany, France). Buildopedia links instruments and points to /find; it does not decide foreign disputes.
Key points
What always transfers
Construction and designed airflow sit before blame. Check loft eaves, air bricks, and extracts. Photograph and give written notice. Surface condensation, interstitial loft damp, and sealed subfloor voids are mechanisms — not national lifestyle myths. See /tenancy/damp-mould-without-blame and the loft/subfloor guides.
United States — habitability + local housing codes
Most states recognise an implied warranty of habitability; many adopt versions of the Uniform Residential Landlord and Tenant Act (URLTA) or similar statutes. Cities often enforce a property maintenance / housing code (frequently based on the International Property Maintenance Code). There is no single federal residential tenancy code — duties sit with the state and municipality. Habitability is the regional counterpart of England fitness; local codes are regional counterparts of HHSRS enforcement.
Singapore — Residential Tenancies Act
Private residential letting has a modern written-tenancy statute (Residential Tenancies Act 2023) with defined processes. Dispute pathways and deposit rules follow that Singapore frame and licensed advisers.
Thailand — Civil and Commercial Code hire of property
Residential occupation commonly sits under hire-of-property rules in the Civil and Commercial Code plus the written contract. Hot-humid reverse condensation under air-conditioning is a frequent moisture story — physics first, then contract. Local counsel handles lease disputes; Buildopedia covers the fabric mechanisms.
Europe — civil-code and national tenancy frames (examples)
Germany: Wohnraummiete under the BGB. France: bail d’habitation with décence / construction-habitation rules. There is no single EU residential tenancy regulation that replaces national Mietrecht or bail rules. Who repairs structure/installations, and whether the dwelling is decent/fit, sit with each national frame.
What differs by country
Each country has its own tenancy templates, clause numbering, repair-section citations, notice routes, and deposit schemes. England AST packs and Landlord and Tenant Act section numbers are the England depth on this site.
Frequently asked
Does England’s Landlord and Tenant Act 1985 s11 apply in the United States?
No. US residential repair and habitability duties sit in state landlord–tenant statutes, the warranty of habitability, and local housing codes.
What should you do when a tenant outside England reports mould?
Run the same physics triage (extracts, vents, eaves, air bricks); open /tenancy/damp-mould-without-blame and this page for the local duty frame; then /find for local advisers.
Is there one European residential tenancy law?
No. Tenancy and habitability remain primarily national (e.g. German BGB Mietrecht; French bail/décence rules). Each member state has its own frame.
Practical checklist
- •Nation (and US state / EU member state) sits beside any repair-duty citation.
- •Building-physics triage is separate from statute labels.
- •The local written agreement sets the tenancy terms.
- •Local licensed professionals or regulated advisers: /find.
- •Rent-withholding and notice strategy follow local advice, not England pages alone.
Notes for readers
Construction and airflow first, then this page for the local duty frame when the tenancy is outside England. England deep pages cover England facts. Buildopedia helps frame better questions for local lawyers and surveyors — it is not a substitute for them.