Search the reference
- ConstructionInsulated cavity wallsA cavity wall with partial or full-fill insulation and, in competent modern work, stainless ties. Different risks from the 1960s uninsulated cavity: cold bridges at openings, saturated fill, and details that bridge the cavity in the name of structure.
- DefectCavity wall tie corrosionSteel ties in early cavity walls rust, expand, crack the bed joints, and stop tying the two leaves. In a high wind that can be more than a crack.
- DefectSubsidenceThe ground under part of the building goes down, and the building follows. Clay shrinkage, leaking drains, and weak or eroded ground are the usual domestic causes. It is not the same as a crack.
- DefectSettlementThe building or its fill compressing soon after it was built, then usually stopping. Old, stable settlement is a record, not a live defect.
- DefectHeaveClay swelling and lifting part of the building, commonly after a tree is removed or after a dry period ends. The opposite of shrinkage subsidence, and often caused by the attempt to cure it.
- DefectMovement between a frame and its infillThe concrete frame and the brick or block panel are different materials. They shrink, creep, and move with temperature at different rates. The crack follows the joint between them.
- RemedyCompatible lime mortar, plaster, and renderPre-1919 Georgian–Victorian solid walls of brick and stone were built to absorb some rain and dry. Lime lets them. Hard cement pointing, cement render, and waterproof coatings keep the water in and then the face of the wall fails.
- RemedyManage trees on shrinkable clay, do not fell in a panicTrees and large shrubs take water from clay and the ground shrinks. That can be subsidence. Cutting the tree down can let the clay swell, which is heave, often more damaging. Management is an arboricultural and engineering decision.
- GuideA single-storey extension in EnglandPlanning, the Building Regulations 2010 (as amended) / Approved Documents, and the junction with the house you already have. The junction is where the next damp problem and the next crack are made. The figures below were checked against Class A of the GPDO as published in 2026. They are not a decision on your house.
- GuideA damp ground floor in a Thai concrete-frame houseDo not import a British rising-damp certificate. Read the frame, follow the monsoon down the outside, then look at the air-conditioning. Most of what gets called damp here is rain, splash, a drip, or condensation.
- GuideCrack monitoring methods — when to watch and when to call an engineerTell-tales, gauges, photos, and level surveys: how to evidence whether cracks are live — and when monitoring is delay dressed as diligence.