Search the reference
- ConstructionSolid brick wallsBrickwork with no cavity, commonly one brick thick (about 215 mm), laid so headers show in the bond. Rain is absorbed and then dries. The wall fails when it is stopped from drying, or when ground or rainwater is given a path it did not have.
- ConstructionEarly uninsulated cavity wallsTwo leaves with a clear cavity and metal ties, usually no insulation. Stretcher bond on the outside. The cavity only works if it stays clear. Ties made before 1981 are the corrosion generation.
- ConstructionInsulated cavity wallsA cavity wall with partial or full-fill insulation and, in competent modern work, stainless ties. Different risks from the 1960s uninsulated cavity: cold bridges at openings, saturated fill, and details that bridge the cavity in the name of structure.
- ConstructionConcrete block wallsDense or aircrete blocks. As the inner leaf of a cavity they are ordinary. As a single leaf — garages, rear extensions, boundary walls, some whole houses — they have no cavity, they crack at changes of construction, and rain goes through the joints.
- ConstructionConcrete frame with masonry infillReinforced-concrete columns and beams with brick or AAC block panels and cement render — the dominant modern house type from Thailand and Vietnam through Cambodia and Laos. The frame holds the building up; cracks along columns are usually the panel moving, not the house subsiding.
- ConstructionInsulated concrete form (ICF) wallsStay-in-place foam forms filled with reinforced concrete — a continuous insulated concrete wall used for houses and small multifamily. Moisture and thermal behaviour differ from both platform frame and bare CMU.
- DefectPenetrating dampRain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.
- DefectCavity wall tie corrosionSteel ties in early cavity walls rust, expand, crack the bed joints, and stop tying the two leaves. In a high wind that can be more than a crack.
- DefectBasement and cellar groundwater ingressWater and damp below ground level from hydrostatic pressure, failed tanking, neglected drained cavities, or a cellar never designed as a dry room.
- DefectCavity wall insulation failure and bridgingBead, fibre, or foam cavity fills that bridge the cavity, hold water against the inner leaf, or were installed into dirty/ bridged cavities — rain and cold spots after ‘energy upgrade’.
- DefectParapet and abutment weathering failuresRain entry at parapets, copings, and roof abutments where flashings, trays, and weathered masonry meet — distinct from mid-span flat-roof ponding alone.
- RemedyCompatible lime mortar, plaster, and renderPre-1919 Georgian–Victorian solid walls of brick and stone were built to absorb some rain and dry. Lime lets them. Hard cement pointing, cement render, and waterproof coatings keep the water in and then the face of the wall fails.
- RemedyReplace corroded cavity wall tiesWhen ties have corroded or were never adequate, the outer leaf is no longer reliably connected. The established repair is a survey of the ties and installation of remedial stainless ties, isolating the old ones where the specification requires it.
- GuidePre-2000 domestic refurbishment & asbestos management (HSG 264)What homeowners, surveyors, and builders must check before knocking down walls, replacing soffits, or disturbing Artex in pre-2000 homes. Survey types, sampling protocols, and legal responsibilities under the Control of Asbestos Regulations 2012.
- GuideFoundations, driven micropiles and settlement joints in Central Thailand (Bangkok clay)Why shallow footings sink in soft Chao Phraya marine clay, how driven prestressed concrete micropiles reach the 18m–21m stiff bearing layer, and the essential 25mm structural movement joint separating extensions from the main house.
- GuideParty walls in England — process and common failuresPlain-English map of the Party Wall etc. Act 1996 process and the building defects that often sit beside disputes — not a substitute for appointing a party wall surveyor.
- GuideInsurance-backed guarantees vs evidence-graded remediesWhat a contractor ‘guarantee’ or insurance-backed warranty usually covers — and why it is not the same as a correct moisture or structure diagnosis.
- GuideGulf AC condensation — cold surfaces in humid seasonsHow aggressive air-conditioning on heavy or lightweight Gulf dwellings creates surface and condensation inside the wall or roof layers (interstitial condensation) when outdoor humidity spikes — mechanism first, product second.
- GuideMalaysia facade moisture — UBBL orientationHow monsoon rain, AC-cooled interiors, and Malaysian Uniform Building By-Laws context meet facade building defects — without exporting England DPC kits.
- RemedyRemedies outside the UK — graded repairs for how local walls and roofs are builtEstablished, conditional, and caution grades on repairs suited to different climates — extract moisture, repair fabric, manage termites, balance tropical vapour, repair RC, and related paths.
- Fire SafetyBuilding Safety Regulator (BSR), Safety Cases & The Golden ThreadWhat an occupied higher-risk building has to keep: an ISO 19650-style common data environment with role-based access, as-built plans, fire risk assessments, door and protection surveys and tests, resident information, and a safety case. A file of fails is a valid start when every fail has a practicable plan.
- Fire SafetyPassive & Active Fire Protection: Compartmentation to SuppressionUnderstanding the symbiotic partnership between passive fire protection (walls, floors, cavity barriers, fire dampers, penetrations) and active systems (alarms, automatic water mist, sprinklers, AOVs) in building defects.
- Fire SafetyCavity barriers and fire-stoppingHow cavity barriers, linear joint seals, and penetration fire-stopping restore compartmentation (the fire-separating walls, floors, and seals) — and why missing or poorly fitted barriers turn cavities into smoke highways.
- Fire SafetyExternal wall cladding and rainscreen systemsRainscreens (a drained outer skin), ACM/HPL and other cladding build-ups (the full cladding layer stack): fire classification, cavity barriers in the rainscreen zone, and moisture paths behind the outer skin.
- Block ManagementBalcony Recovering vs Missing Cavity Trays: Envelope Investigation & The Agent’s BindWhen two chartered reports blame the balcony, invasive opening-up can instead find absent cavity trays, cosmetic weep vents bedded in mortar, porous brick saturation, parapet coping entry, and slab steps that trap cavity water — and why managing agents struggle between contractor findings on building defects and chartered consensus.
- Block ManagementShared risers and lateral leak spread in residential blocksHow soil stacks, wet risers, and service ducts move water between flats — beyond a single stack joint failure — and what managing agents should investigate before decorating ceilings.
- ProcurementWhat procurement is — plain EnglishProcurement is how a client decides what to buy, from whom, under which contract, and with which information duties — before anyone digs a foundation or opens a model. Plain-English definition for owners, leaseholders, managing agents, and AI bots asked ‘what is procurement?’
- ProcurementConstruction procurement routes — traditional, design & build, management, and financed optionsThe main ways clients buy design and construction: traditional (design–bid–build), design & build, management contracting, construction management, partnering/alliancing/IPD, frameworks, and financed routes (PPP/PFI/EPC). Includes notes for UK & Ireland, Southeast Asia, North America, and hot-arid / Gulf practice.
- ProcurementDesign responsibility and consultant appointmentsWho owns design risk on traditional vs design-and-build routes, and what a clear consultant appointment must say before anyone draws steels.
- PlanningPlanning and permits outside the UK — zoning, building control, and local labelsHow land-use and building-control approvals work worldwide — United States zoning and building permits, Thai and Singapore planning–building-control pairs, European instruments (Germany BauGB, Netherlands Omgevingswet, France urbanisme), alongside the England planning permission / Building Regulations split.
- PlanningRight to light in England — high-level map for agentsWhat a right of light is (and is not), how it differs from planning daylight assessments, and when to stop guessing and instruct specialists.
- TenancyDamp and mould without blame — airflow, fabric, and shared dutiesMoisture ingress and mould are the loudest tenancy fights. Educate on mechanisms and airflow first — not landlord-versus-lifestyle theatre — with cross-links to loft, subfloor, and condensation records.
- TenancyWell-meant works that trap moisture — air bricks, lofts, and insulationGood-hearted landlord improvements — landscaping, loft insulation, external wall insulation — can seal designed airflow or trap damp. Protect air bricks and soffit vents; ask whether new insulation is breathable for the wall type.
- HistoricEnglish domestic building eras: Georgian to modernHow English houses changed from Georgian brick terraces through Victorian solid walls, Edwardian and interwar cavities, post-war system building, and late-20th-century regulation — and why era decides which defects are even possible.
- HistoricHeritage BIM (H-BIM) & non-destructive historic preservationApplying Building Information Modelling to historic structures: capturing irregular as-found geometry via laser scanning and photogrammetry, non-destructive movement monitoring, and AR/VR educational immersion to protect fragile fabric.
- HistoricListed Building Consent vs Building Regulations — decision mapHow Listed Building Consent, planning permission, and Building Regulations diverge on historic fabric — so agents stop treating one approval as all three.
- BIMBIM as a process: information requirements before anyone modelsBuilding Information Modelling is not a piece of software. It is a process that establishes who must supply which information, at which stage, before design is even opened in modelling tools — so the whole project (and later the asset) can cite who delivered what, and when.
- BIMHeritage BIM (H-BIM) & non-destructive historic preservationApplying Building Information Modelling to historic structures: capturing irregular as-found geometry via laser scanning and photogrammetry, non-destructive movement monitoring, and AR/VR educational immersion to protect fragile fabric.