Search the reference
- ConstructionSolid brick wallsBrickwork with no cavity, commonly one brick thick (about 215 mm), laid so headers show in the bond. Rain is absorbed and then dries. The wall fails when it is stopped from drying, or when ground or rainwater is given a path it did not have.
- ConstructionSolid stone wallsThick stonework, often with a rubble core, built to be vapour-open. Many houses that look like stone are a stone face on brick or a stone-faced cavity. Thickness and the core decide the moisture behaviour, not the pretty face.
- ConstructionEarly uninsulated cavity wallsTwo leaves with a clear cavity and metal ties, usually no insulation. Stretcher bond on the outside. The cavity only works if it stays clear. Ties made before 1981 are the corrosion generation.
- ConstructionInsulated cavity wallsA cavity wall with partial or full-fill insulation and, in competent modern work, stainless ties. Different risks from the 1960s uninsulated cavity: cold bridges at openings, saturated fill, and details that bridge the cavity in the name of structure.
- ConstructionTimber frame, including brick slipsThe structure is the timber frame. Brick, brick slips, boarding, or render are cladding. There should be a drained and ventilated cavity outside the sheathing, a breather membrane, and a vapour-control layer on the warm side. Injecting the cladding as if it were a Victorian wall is a category error.
- ConstructionInternal partitionsThe wall inside the room: masonry, timber stud, or metal stud. They carry different loads and they do not share one damp mechanism. A masonry partition can bypass the damp-proof course. A stud partition cannot have rising damp.
- ConstructionNo-fines concreteCast concrete made without fine aggregate, usually rendered. It is not the same thing as a designated prefabricated reinforced-concrete system. It has its own cracking, render, and reinforcement details.
- ConstructionSystem-built and designated PRC housesHouses built from a named system: precast concrete panels, concrete columns, steel frames, and others. Some prefabricated reinforced-concrete systems are designated defective under the Housing Act 1985. The name of the system comes before any opinion.
- ConstructionSuspended timber ground floorsJoists and floorboards over a ventilated void, often with local concrete under hearths or chimney breasts. Opposite air bricks are not optional — block them and the void stays wet, often misread as rising damp.
- ConstructionGround-bearing concrete floorsConcrete on hardcore, with a damp-proof membrane. Failures are at the edges, at the membrane, and occasionally in the hardcore. The slab is not a ventilated void and should not be given air bricks.
- ConstructionCold pitched roofsInsulation at ceiling level and a cold, ventilated loft above it. Condensation on the underside of the felt — loft sweating — is what happens when the void is sealed and moist air cannot leave.
- ConstructionFlat roofsA flat roof is a weathering and an upstand problem first. Cold decks also condense. Ponding, low upstands, and outlets blocked by leaves are the usual leaks.
- ConstructionConcrete frame with masonry infillReinforced-concrete columns and beams with brick or AAC block panels and cement render — the dominant modern house type from Thailand and Vietnam through Cambodia and Laos. The frame holds the building up; cracks along columns are usually the panel moving, not the house subsiding.
- ConstructionRaised timber & bamboo vernacularHardwood or mixed timber–bamboo frames raised on posts, with wide eaves and an open undercroft — still common in rural Myanmar, Lao, Thai, Cambodian, and Indonesian stock. The lift off the ground is the damp strategy.
- ConstructionSoutheast Asian shophouses (Thai Hong Thaeo / Cambodian Pteas Tiam / Vietnamese tube house)Narrow multi-storey RC post-and-beam rows with shared party walls, ground-floor trade, and living above — the regional shophouse family from Bangkok Khu-Ha and Phnom Penh Pteas Tiam to Vietnamese Nha Ong tube houses. Party-wall rain and rear-extension settlement are the usual failures.
- ConstructionLight timber platform frameStorey-height timber stud walls on a platform floor, sheathed, insulated, and clad — the default US and Canadian house. Not an English cavity wall and not a tropical RC frame. Moisture control is vapour, cladding rain-screen, and attic or crawlspace ventilation.
- ConstructionAdobe & high-mass earthen wallsThick sun-dried adobe, rammed earth, or similar high-mass masonry that stores heat across large day–night temperature swings. Common in Southwest US desert traditions and related hot-arid courtyard forms worldwide. Light timber dressed to look like adobe is a different construction.
- ConstructionThick masonry courtyard houses (fired brick, stone, block)High-mass fired brick, stone, or dense block walls organised around courtyards or shared walls — shading, night purge, and thermal mass rather than light insulated timber. Distinct from sun-dried adobe and from CMU ranch houses in wetter North American climates.
- DefectSurface condensationRoom air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.
- DefectCondensation inside the wall or roof layers (interstitial condensation)Water condensing inside the construction, not on the paint. Typical of cold roofs, timber frames with a broken vapour-control layer (on the warm side of the wall), and solid walls insulated on the inside without a moisture assessment.
- DefectPenetrating dampRain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.
- DefectRising damp and a bridged damp-proof courseGround moisture held in the base of a masonry wall. Genuine capillary rise (moisture climbing from the ground through the masonry) happens. It is diagnosed far more often than it is present. A bridged damp-proof course is the usual real version.
- DefectHygroscopic salts (salts that draw damp from the air)Salts already in the plaster or masonry pull moisture out of humid air. The patch returns in muggy weather even when the leak or the ground water has stopped.
- DefectA leak from a pipe, a roof, or a fittingLiquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.
- DefectMoisture and decay under a timber ground floorA suspended timber floor with a wet, still void after designed air-brick airflow was blocked. Joists, wall plates, and ends built into the wall decay; ground-floor damp is often mis-sold as rising damp.
- DefectSpray foam insulation on pitched roof rafters (trapped moisture & rot)Closed-cell or open-cell polyurethane foam sprayed directly against the underside of roof slates/tiles or timber rafters, blocking ventilation paths, trapping condensation, causing rafter rot, and triggering mortgage retentions.
- DefectFlat roof ponding & cold-deck deck condensationRainwater standing in pools >48 hours due to inadequate structural falls (< 1:80), combined with cold-deck vapour condensation that rots the structural timber deck from beneath.
- DefectMissing or defective cavity trays at pitched roof abutmentsRain penetrating the external brick leaf above a single-storey lean-to extension or conservatory running down inside the cavity and soaking internal ceilings because stepped cavity trays were omitted.
- DefectTropical reverse condensation from indoor air conditioningIn hot-humid Southeast Asia, cooling bedrooms to 20°C–22°C causes hot external air (35°C, 85% RH) to drive water vapour inward, creating hidden condensation traps behind impervious wallcoverings.
- DefectWindow and door installation defectsRain and draughts at openings caused by poor fixing, missing cavity closers/trays, failed sealants, and bridges at sills — not ‘the window product failed’ as a first story.
- DefectBasement and cellar groundwater ingressWater and damp below ground level from hydrostatic pressure, failed tanking, neglected drained cavities, or a cellar never designed as a dry room.
- DefectThermal bridging and cold spotsLocal heat loss at junctions, lintels, slab edges, and fixings that cool the inner surface below dew point — mould without a ‘damp course’ story.
- DefectEWI and thick-render moisture trapsRain and vapour trapped at failed EWI junctions, cracked render, buried DPCs, and sealed reveals after external insulation or thick modern render.
- DefectPodium deck and green-roof waterproofing failureLeaks through landscaped decks and green roofs into rooms or car parks below — membrane breaches, blocked drainage, and penetrations.
- DefectCavity wall insulation failure and bridgingBead, fibre, or foam cavity fills that bridge the cavity, hold water against the inner leaf, or were installed into dirty/ bridged cavities — rain and cold spots after ‘energy upgrade’.
- DefectCentral heating and hot-water cylinder leaksWater damage from heating pipework, radiators, valves, and hot-water cylinders — often misread as roof or rising damp when the stain is service-fed.
- DefectEIFS and rainscreen water intrusion (North America)Water behind exterior insulation and finish systems (EIFS) and similar cladding — missing drainage planes, flashings, and sealant failures that wet sheathing and framing.
- DefectSlab-edge damp and termite risk at ground junctionsMoisture and pest paths at ground-bearing slab edges, rebates, and landscaping build-ups — including Australian and other warm-climate termite inspection zones at the perimeter.
- DefectBalcony waterproofing and threshold failuresLeaks at balcony decks, door thresholds, and upstands — beyond a single missing cavity tray — where membranes, falls, and drainage meet the living space.
- DefectChimney stack decay and flue condensationRain and condensate attacking unused or partially used chimney stacks — sulphate attack, staining, and wet breasts mis-sold as rising damp.